My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 REMOVAL AND INSTALL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_1998 REMOVAL AND INSTALL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2021 2:55:56 PM
Creation date
6/3/2020 9:44:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 REMOVAL AND INSTALL
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_1998 REMOVAL AND INSTALL.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
These instructions only anply to steel underground - The COAWctor is also responsible for providing a <br /> storage tanks. back-hdWd operator for a period of time to assist with <br /> PRE-INSTALLATION: the insertion of ReTank parts. <br /> The ReTank candidate tank is inspected subject to the (Note:The period of time for heavy equipment assistance <br /> following criteria: is typically no more than 2 days after FCI approves the <br /> interior condition of the steel tank.) <br /> - The water table must be maintained at or below the _ The Contractor is responsible for maintaining security <br /> bottom of the tank p 9 <br /> barriers around the job site. <br /> Deflection of the existing tank does not exceed 3% of <br /> the original diameter as determined by measuring the <br /> vertical diameter of the tank through a fitting. FCI INSPECTION: <br /> - The minimum vertical tank diameter is 91" for a 96" - The tank is tested for benzene and explosive vapor levels <br /> diameter steel tank prior to FCI personnel entry. <br /> CONTRACTOR PREPARATORY WORK: - The tank is then continuously vented and monitored for <br /> oxygen and flammable vapor levels. The tank may be <br /> - The Contractor removes backfill, piping, and electrical entered when the oxygen level is greater than 19.5%and <br /> connections from the top of the tank. the flammable vapor level is less than 10%of the Lower <br /> - The Contractor arranges for / provides equipment Explosive Limit. <br /> necessary to unload ReTank equipment and supplies. - The ReTank candidate tank is inspected internally subject <br /> Note:This includes pallets and/or 55 gallon drums. It to the following guidelines: <br /> may also include a large sealed container(8 ft x 8 ft x - Indention's or other surface discontinuities are less than <br /> 20 ft Sea-Train) 1/2"high. <br /> - The tank is then triple-washed,cleaned and defumed, Note:Surface irregularities outside of these guidelines will <br /> under the direction of a local contractor(designated as require review by FCI personnel and may require special <br /> The Contractor)and in accordance with API Standards, repair procedures before the ReTank process can be <br /> 2015 Safe Entry And Cleaning Of Petroleum Storage performed. <br /> Tanks, and RP 1631, Interior Lining Of Underground z <br /> Storage Tanks. Also follow OSHA Regulation 29 CFR <br /> Parts 1910,Confined Space Entry Procedures,as well TYPICAL RETANK INSTALLATION <br /> as any applicable local safety regulations PROCEDURE: <br /> The Contractor cuts holes at the top axis of the steel - Entry openings are typically cut in the top of the tank at <br /> tank according to dimensions provided by FCI for the planned manway and fitting locations. <br /> purpose of providing space for the installation of manway <br /> (s)and containment collars in the new fiberglass ReTank. 4► <br /> Note: The above referenced entry holes are typically ; <br /> 60" x 60" square openings. These entry points have <br /> been created in the following ways: <br /> •oxygen/acetylene torch - Tripods may be installed over the manway hole cutouts. <br /> •abrasive cut-off type portable saw Chain hoists are attached to the tripods to provide support <br /> •saber saw for the panel insertion equipment. <br /> After the entry holes are completed, the Contractor is - The endcap opposite the entry hole is installed in 3 pieces <br /> responsible for and held in place with jacks until the permanent fiberglass <br /> • removing slag, burrs or any other irregular surface seams are applied. <br /> (resulting from the creation of the entry holes)from <br /> the edges of the entry holes <br /> • grinding the external tank surface(down to bare metal) <br /> for an area of 6"around the perimeter of each (2)of <br /> the 60"x 60"openings <br /> • removing any brackets, braces, fittings or anything - Prefabricated panels are hinged together in groups of 3 +_ <br /> that protrudes into the interior of the tank that would (designated as tri-folds),folded together and secured with <br /> interfere with an intimate fit of the fiberglass to steel straps. <br /> • removing all loose debris from the interior of the tank <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.