My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 REMOVAL AND INSTALL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_1998 REMOVAL AND INSTALL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2021 2:55:56 PM
Creation date
6/3/2020 9:44:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 REMOVAL AND INSTALL
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_1998 REMOVAL AND INSTALL.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Single wall pressu d lines cannot be left in place unl they were put in <br /> under a permit from the EHD. If these lines were not installed under permit <br /> and inspection, the lines must be verified to have been properly installed by <br /> uncovering and inspection of the lines by a special inspector and this <br /> inspection observed by EHD staff. Sampling of the line area will also be <br /> required in order to determined if any unauthorized release has occurred. <br /> Sampling is required and must be completed under EHD permit. (CCR Title <br /> 23 section 2660 (1) (k)) <br /> 5. Any tank and line monitoring system to be proposed must be found listed in <br /> LG113#, and must meet the requirements of CCR Title 23 section 2666. This <br /> monitoring system must also provide pump shutdown upon leak detection. <br /> Per CCR Title 23 section 2660 (n) which refers to CCR Title 23 section 2635 <br /> (2A) (213) will apply to any corrosion protection system. <br /> 6. Dispenser pans are required if any work is done to the piping and dispenser <br /> systems. <br /> If you have any questions regarding this matter, please contact me at (209)468- <br /> 3446. <br /> Karen Furst, M.D.,-M.P.H. <br /> Health Officer <br /> Doug ilson, Supervising R.E.H.S. <br /> Environmental Health Division <br /> DW/dw <br />
The URL can be used to link to this page
Your browser does not support the video tag.