Laserfiche WebLink
19. Piping (cross-sectional d m, including connections to tank and dispe ). <br /> (A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br /> Restricts delivery of flow to tank (section 2635 (b) (2) (B) or (C)I, or <br /> Provide positive shut off of flow to the tank at no more than 95 % (Section 2635 (b)(2)(0I, or <br /> (B) Z Vapor recovery piping designed so it cannot contain Liquid phase product, or <br /> (C) Suction piping (below grade piping operates at less than atmospheric pressure) (Section 2636 (a) (3)I <br /> Sloped so contents of the pipe wilt drain back into the storage tank if the suction is <br /> released. <br /> _ No valves or pumps installed below grade. <br /> Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br /> (D) Corrodible underground piping protected against corrosion (section 2636 (b)). <br /> (E) Underground primary piping wilt meet all of the following requirements <br /> _V/- Primary piping.in contact with hazardous substance under normal ope ation conditions shat( be: <br /> Installed inside a secondary containment system in the form of: ? secondary pipe Vault or <br /> / _lined trench to be stoped to a collection sump at the low point of the piping. <br /> V Primary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> Lined trench used as secondary containment <br /> Material compatible with the substance stored. <br /> Covered and capable of supporting any expected vehicular traffic. <br /> (F) Underground piping with secondary containment will be equipped and monitored as follows: <br /> Secondary containment wilt be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. <br /> Automatic tine teak detectors will be installed on pressurized piping <br /> Manufacturer:t i� '' Model: LZ :2C---C <br /> _ Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> Annual tine tightness test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring system <br /> fails or is disconnected. <br /> 20. -Z State Water Resources Control Board "Facility (A)" and "Tank Permit (B)/t application forms submitted. <br /> 21. Plan review and operating permit fees paid. �1 <br /> 22. V/ What is the approximate depth to ground water: <br /> O nctude source of information - borehole togs. monitoring well data, water <br /> studies, etc.) <br /> 23. Total number of tanks on site after installation: - N � <br /> 24. _Z County/City Fire District and Building Department notified. <br /> 25. In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility lin accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> Requirements] as an owner or operator to submit a workplan to PHS-EHO Site Mitigation Unit prior to initiating any <br /> assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br /> The owner r op a r mu cknowledge this responsibility for workplan submittal by signature and date below. <br /> Name G E"' t Title sa Irl?" FG �"/`_ ', Date.. ZZ nE/0""— <br /> CONDITIONS•OF APPROVAL: <br /> S <br />