Laserfiche WebLink
01/19/1999 16:31 2033651543 TANKNOLOGV PAGE 05 <br /> INDIVIDUAL <br /> 6goo SHOAL CREEK.BUILDING 200 WORK ORDER NUM 107114 <br /> TEST DATE 01118199 AUSTIN.TEXAS 76757(512)451-6334 CLIEPIT:p 280 c zc SITEMNOCAL #11193 <br /> Tank ID: 92 3 Tank manitolded: o om to top fill in inches: 174.0 <br /> Product: 711LICKlux Vent manitolded: Yms Bottom to grade in inches* 2.60.0 <br /> Capacity In gallons: 10, 369 Vapor recovery manitolded: YXIII Fin pipe length in Inches: 50.0 <br /> Diameter in inches' 139.00 Overfill protection: YZ8 Fill pipe diameter in inches' 4.0 <br /> Length in inches: 231 Overspilt protection: YZ8 Stage i vapor recovery. <br /> Material: DW FIBEAG installed: ATO Stage ll vaporrecovery: AllifiXET, <br /> GP installed on: ® / <br /> COMMENTS <br /> Start(in) End(In) <br /> Dipped Water Level, 0.00 0.00 New/poesed Falle6freplaced NeWpassed FalIG&MPISCOd <br /> Dipped product Level: 02.00 $2.00 L.D.At L D.#1 L.D.$2 L.D. <br /> 02 <br /> Probe Water Level: -0.007 0.000 Make: vmponLus <br /> Ingress Detected: Water N 15uwe is UAagem Model: Lt32000 <br /> Test time- 12:67-15v07 S/N: 0/9 <br /> Inclinometer reading. 0.00 Open time in sec: 4.00 <br /> VacuTect Test Type: NuItLple tanks Holding psi. 13 <br /> Resiliency cc: iao <br /> VacuTect Probe Entry Point' 7112 Teat look rate ml/m: 109.0 <br /> Pressure Set Point: -0.50 Metering psi: 10 <br /> Tank water level in inches: 0.00 Clib.leak in gph: 3.00 <br /> Water table depth in inches' 145.00 Resulte: PAM <br /> Determined by(method)' moNTR wzLL <br /> Re%uW VA86 <br /> COMMENTS <br /> COMMENTS <br /> Matenak DW FI <br /> Diameter(In)- 2.0 <br /> Length(ft): 120.0 <br /> Test psi 50 <br /> Bleedback cc: 83 <br /> Test time(min). 30 NOT NOT NOT <br /> Start time: 16800 T STV TZ8TZV TZSTffD <br /> End time- 16130 <br /> Final gph- 0.009 <br /> Result PARS <br /> Pump type: FRZOSURZ <br /> Pump make: TZ PZTRO <br /> COMMENTS Impact Valves Operational: YEN <br /> Draft 01/19/1999 15:14 MSHAW <br />