Laserfiche WebLink
01/19/1999 16:47 2033651543 TAWNOLOGY PAGE 04 <br /> INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> Moll,rankrwiagy <br /> TEST DATE:01/18/99 8900 SHOAL CREEK,BUILDING 200 <br /> CLIENT:VAMvTno !t',E :v <br /> CNANXCAL AUSTIN,TEXAS 78767(512)451-S&U WORK ORDER 021193 9207211 <br /> SITE1iOC11,y Ailll9 <br /> Tank ID: 92 3 Tank manifolded: No <br /> Product: PpzmTu. Very manifolded: YES Bottom to top fill in inche'. .174.0 Capacity in gallons: 10,369 Vapor recovery manifolded; YES Bottom to grade in Inches: 180.0 <br /> Diameter in inches: 118,00 Overfill protection: YES Fill pipe length in inches: 06.0 <br /> Length in inches: 221 Overspill protection: Yes Fill pipe diameter in inches: 4.0 <br /> Material: torr Frss>Rc Stage I vapor recovery: VVu, <br /> Installed: ATO <br /> CP installed on stage If vapor recovery: ASSIST <br /> / / <br /> COMMENTS <br /> Start(in) End(in) <br /> Dipped Water Level: o.oo 0100 NsW/pess6d Failedfreplaced NOW/passed Felled/replaced <br /> Dipped Product level: ea.00 82.00 <br /> L.D.#1 L.O.01 L.D.02 L.D <br /> Probe Water Level: -0.003 0.000 Make: vaaotarsea <br /> Ingress DetertArh Wetter>N Bubble N UllagaX Model: LD2000 <br /> Test time: 12-47-15z07 S/N: At. <br /> Inclinometer reading: 0.00 Open time in sec: 4.00 <br /> VacuTect Test Type: Xult:iple tanks Holding psi, 12 <br /> VacuTect Probe Entry Point: Fill Resiliency cc: 130 NOT <br /> Pressure Set Point: -0.50 <br /> Test leek rate mVm: 169.0 TZSTsa Tank water level in inches: 0100 10 <br /> Catib.leak Metering psl:psi,In qph: 3.00 <br /> Water table depth in inches: 145.00 Results: rias <br /> Determined by(method): XONTR WELL <br /> Result: PASS <br /> COMMENTS <br /> COMMENTS <br /> T <br /> E 1'I <br /> Material: Vw F13ZR9 <br /> Diameter(in): 2.0 <br /> Length(ft): 120.0 <br /> Test psi: 5o <br /> Bleedback cc: e5 <br /> Test time(min): 30 NO NOT NOT <br /> Start time: 16100 TESTED T28TED TESTED <br /> End time: 1600 <br /> 30 <br /> Final gph: 0.009 <br /> Result: PASS <br /> Pump type: PRESSURE <br /> Pump make: FE PETRO <br /> COMMENTS Impact Valves Operational: YES <br /> If 1 <br /> Draft 01/19/1999 15:14 MSHAW <br />