My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2021 4:16:13 PM
Creation date
6/3/2020 9:44:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\3202\PR0231129\DIESEL TANK CONVERSION PLAN 2003.PDF
QuestysFileName
DIESEL TANK CONVERSION PLAN 2003
QuestysRecordDate
11/15/2011 8:00:00 AM
QuestysRecordID
162827
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SERIM VAPOR LI N. E SV# AR VALVES2 <br /> �4 <br /> OPW 60VS-1000 OPW 6OVSP-1001 OPW 60VSPC-1001 <br /> "Line Saver" "Vapor Saver" "Vapor Saver with <br /> ® 11h" connection to underground Same features as the 60VS-1000 plus: Containment Threads" <br /> piping. ® Double-poppeted design helps Same features as the 60VSP-1001 <br /> * Air test port to enable vapor line prevent vapor loss in the event plus: <br /> testing without breaking pipe the dispenser is toppled. ♦Externally threaded on outlet <br /> connections. ♦ CARB approved. end for secondary containment <br /> ♦ Choice of top or side inlet ♦ UL listed connection of underground piping. <br /> connection. <br /> ® Stabilizer mounting connection. <br /> 2'Y16" <br /> 75mm. <br /> � a <br /> � o <br /> 6'/z <br /> 177mm. <br /> DPW 60VSPC-1001 OPW 60VSPC-1001 <br /> Materials <br /> Body:cast iron with black Duragard®coating <br /> Discs:M-19 <br /> Ordering Specifications <br /> Product No. Thread Size Length <br /> in mm in mm <br /> 60VS-1000 10/2 631/32' <br /> 60VSP-1001 10/2 631/32' <br /> 60VSPC-1001 1 x11/2 631/32' <br /> 60VSK-1002 Kit Includes:(2) lockwashers, <br /> (2) Nuts, (1) U-Bolt, (3) Hex IMPORTANT: OPW products should be used in <br /> compliance with applicable federal,state and local laws <br /> Screws, (3)Washers and regulations. Product selection should be based on <br /> physical specifications and limitations and compatibility <br /> with the environment and materials to be handled. <br /> OPW MAKES NO WARRANTY OF FITNESS fi <br /> FOR A PARTICULAR USE. All illustrations and t <br /> specifications in this literature are based on the latest <br /> product information available at the time of publication. <br /> OPW reserves the right to make changes at anytime in <br /> prices,materials,specifications and models and to <br /> discontinue models without notice or obligation. <br /> a � <br />
The URL can be used to link to this page
Your browser does not support the video tag.