Laserfiche WebLink
r <br /> CO.NSIDER <br /> OmFIT- S OF '. <br /> ®!M <br /> 3'ERGLASS P. IPIN.G . .. '. <br /> re �, <br /> 5. <br /> When the termination <br /> �y '=ec^�..• k. ��a,h; ,fir . <br /> Vii• ..:1;"' "'' r?. <br /> J+.' 't 44e• :t�S4..ih F^` rV,d'H� _} <br /> eRMl�ll!{ ••, 1•. tom•°A \ '• �F .. ::•"'� r' <br /> `a-a =1 Y- '4} •are•. ..• f•.•• 3:. �Ijn� - • - .i <br /> Ba.Sc'v �L0 <br /> FLED THREAD 11 double-wall secondary containment piping helps sump.the complete system will be pressu c reducer eetestab e�s installed 'ere it <br /> installers meet EPA regulaUons and protect the environment <br /> with all concentrations of ethanol and belled fittings. For proper tapering <br /> High Flow Capacity <br /> methanol, including 100%. carefully follow the operating instruc <br /> RED THREAD II pipe has a greater Adhesive kits contain epoxy resin tions (bulletin 9106) included with th <br /> flow capacity than many other pipes and hardener in separate containers, tapering toot kit. <br /> with the same O.D. This is because its joint cleaner, mixing stick, paint brush, For detailed installation instruction <br /> high-strength, fiberglass construction and paper towels. covering assembly, burial, testing an <br /> provides a smoother I.D.and can pro- A detailed instruction sheet is also repair, refer to Smith Fiberglass Product <br /> vide a larger I.D.for specified pressures. included with each kit.Refer to approp- bulletin 1055 for product piping an( <br /> Thermal Conductivity riate installation bulletin for additional bulletin 1190 for containment piping- <br /> The thermal conductivity of RED information including cure cycle times_ Handling and Storage <br /> f that Following these instructions will insure RED THREAD II pipe is packaged it <br /> THREAD II pipe is onlya fraction o <br /> of sleet. fast and easyassernblyof REDTHREAD 11 compact bundles of four to eigh <br /> piping systems, lengths. Bundles of RED THREAD I <br /> Low Coefficient of <br /> pipe can be safely stored on level grounc <br /> Tapering <br /> Linear Expansion when RED THREAD II pipe is cut to or on racks with 10-foot(or less) suppor <br /> The coefficient of expansion of RED length on the job site, the cut end must spacing. Reasonable care must be uses <br /> THREAD II pipe is t/s to Va thatof thermo- be relapered.A field tapering tool avail- in handling RED THREAD II pipe. Dc <br /> plastic pipe and only twice that of steel. able from Smith Fiberglass Products is not drop or throw RED THREAD Ii pipE <br /> used for this purpose.The tool quickly on the ground or drop rocks or other <br /> Adhesives heavy objects on it. Follow the propel <br /> Designed specifically for the RED applies the proper taper by a shaving vY 1 <br /> g the adhe- operation — similar to a pencil shay- procedures for inspect... <br /> p!pin€ <br /> THREAD II piping system, ever. Plain unthreaded field-made materials as stated in Smith Fiberglass <br /> lives required for joining product and P Products installation bulletin 1055. <br /> containment piping are Smith Fiber- installed threaded T.A.B. joint cours can be joined with tpled For industry reference,see API Publication 1615/El; <br /> glass Products DS-7000 series adhesives. "Installation of Underground Petroleum Storage Sys <br /> Testing of the adhesive systems ends.Either factory-made T.A.B.spigots iems,"and PEVRP100-87"Recommended Practices fo, <br /> shows that they are compatible for use or field-made tapers may be joined with Installation of underground Liquid Storage systems." <br /> 3 <br />