My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2021 4:16:13 PM
Creation date
6/3/2020 9:44:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\3202\PR0231129\DIESEL TANK CONVERSION PLAN 2003.PDF
QuestysFileName
DIESEL TANK CONVERSION PLAN 2003
QuestysRecordDate
11/15/2011 8:00:00 AM
QuestysRecordID
162827
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Performance Primary operating pressures to 300 psi(20 bar) <br /> Continuous operating temperature to 150°F(66°C) <br /> Containment system Listed by Underwriters Laboratories to 75 psi(5 bar) <br /> Individual system components may not have the same ratings as the pipe.Refer to the <br /> detailed product information for the specific components to determine the pressure <br /> rating for the system as a whole. <br /> Composition Primary pipe:Filament-wound fiberglass reinforced epoxy pipe with integral epoxy liner <br /> and exterior coating.When classified in accordance with ASTM D2310 and ASTM <br /> D2996,the pipe meets the following cell limits:RTRP 11 CX-5430. <br /> Pipe containment:Filament-wound fiberglass reinforced epoxy pipe. <br /> Interstitial space:Dry sand particles(10-20 mesh)secured in place with adhesive <br /> backed polypropylene tape. <br /> Fittings:Compression molded or filament-wound fiberglass reinforced epoxy primary <br /> fittings.Containment fittings are filament-wound fiberglass reinforced epoxy. <br /> Adhesive:Ameron B20 ambient-cure,two-part epoxyfor all services(including alcohols) <br /> Joining system Primary:Bell and spigot taper/taper adhesive-bonded joint <br /> Containment:6 TPI(threads per inch)modified ACME threaded joints with O-ring <br /> gasket seals.Injection molded parts are made of acetal co-polymer listed by U.L. <br /> Seals are U.L.Recognized nitrile rubber compound. <br /> Pipe lengths Standard 20 ft.(6.1 m)random lengths 17 to 21 ft.(5.2 to 6.4 m) <br /> and 27 ft.(8.2 m)random lengths 25 to 27 ft.(7.6 to 8.2 m) <br /> Other lengths available upon request. <br /> Fittings Primary- Adapters:bell x NPT male' Flange stub ends' <br /> Adapters:bell x NPTfemale2 Isolation bushings! <br /> Adapters:spigot x NPT female2 Nipples2 <br /> Adapters:spigot x NPT male2 Reducer bushings' <br /> 45°elbows' Repair couplings' <br /> 90°elbows' Sleeve couplings2 <br /> End caps' Tees' <br /> Flange rings' Dispenser pan penetration fittings' <br /> Containment- 45°elbows Termination tees <br /> 90°elbows Couplings4 <br /> Tees Termination assemblies2 <br /> Reducers Jumpover assemblies(feex 45°elbows) <br /> 1 Molded fitting <br /> 2 Filament-wound fitting <br /> 3 Other fittings available without UL Listing <br /> 4 Filament-wound or injection molded outer layer;molded outer layer is separate <br /> 5 Not yet Listed by U.L;for 3-and 4-1nch sizes only <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.