Laserfiche WebLink
A <br /> ' SWRCB,January 2002 Page of <br /> 4. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ _ <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer ❑Industry Standard -1 Professional Engineer <br /> ❑Other(Sped) <br /> Test Method Used: ❑Pressure Vacuum Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: h Equipment Resolution: <br /> Spill Box# G� Spill Box# Spill Box# '' � Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: t t t <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: S V'ut V1 <br /> Test Start Time: ; e <br /> Initial Reading(Ri): <br /> s' <br /> Test End Time: <br /> Final Reading(RF): G , C, c <br /> Test Duration: inn ki <br /> Change in Reading(RF-Rj): <br /> Pass/Fail Threshold or <br /> Criteria: rR S Ci S S U <br /> Test Result: XPass ❑Fail Pass ❑Fail A Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />