My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2021 4:16:13 PM
Creation date
6/3/2020 9:44:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\3202\PR0231129\DIESEL TANK CONVERSION PLAN 2003.PDF
QuestysFileName
DIESEL TANK CONVERSION PLAN 2003
QuestysRecordDate
11/15/2011 8:00:00 AM
QuestysRecordID
162827
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> ' SWRCB,January 2002 Page of <br /> 4. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ _ <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer ❑Industry Standard -1 Professional Engineer <br /> ❑Other(Sped) <br /> Test Method Used: ❑Pressure Vacuum Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: h Equipment Resolution: <br /> Spill Box# G� Spill Box# Spill Box# '' � Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: t t t <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: S V'ut V1 <br /> Test Start Time: ; e <br /> Initial Reading(Ri): <br /> s' <br /> Test End Time: <br /> Final Reading(RF): G , C, c <br /> Test Duration: inn ki <br /> Change in Reading(RF-Rj): <br /> Pass/Fail Threshold or <br /> Criteria: rR S Ci S S U <br /> Test Result: XPass ❑Fail Pass ❑Fail A Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.