Laserfiche WebLink
D. Results of Testing/Servicing <br />Software Version Installed: <br />Com the fnllnwino Checklist: <br />Yes <br />❑ No* <br />Is the audible alarm operational? <br />Yes <br />❑ No* <br />Is the visual alarm o erational? <br />9 Yes <br />❑ No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />Yes <br />❑ No* <br />Were all sensors installed at.lowest point of secondary containment and positioned so that other equipm9will <br />not interfere with their proper operation? <br />❑ Yes <br />❑ No* <br />If alarms are relayed to a remote monitoring station,- is all communications equipment (e.g. modest) <br />N/A <br />operational? <br />Yes <br />❑ No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />❑ N/A <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check all, that apply) l�,Sumpffrench Sensors; El Dispenser Containment Sensors. <br />Did you confirm positive shut -own due to leaks and sensor failure/disconnection? Yes; ❑ No. <br />❑ Yes <br />❑ No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br />N/A <br />mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br />fillpoint(s) and o crating ro erl ? If so, at what percent of tank capacity does the alarm tri er? <br />❑ Yes* <br />'A. No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement parts in Section E, below. <br />❑ Yes* <br />15L No <br />Was- liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) ❑ <br />Product; ❑ Water. If jes, describe causes in Section E, below. <br />Yes <br />❑ No* <br />Was monitoring system set -u reviewed to ensure ro r settin s? Attach set u re orts, if a licable <br />Yes <br />1 ❑ No* <br />Is all monitoring ui mentoperational per manufacturer's specifications? <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Continents: <br />Page 2 of 33 03/01 <br />