Laserfiche WebLink
xa Am <br /> "'UNIFIED PROGRAM CONSOLIDATED FOR >< <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Page 1 of 2 <br /> TYPE OF ACTION ❑ 1.NEW PLAN ❑■ 2.CHANGE OF INFORMATION 490-1' <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> .,, <br /> I. F'AOII:ITY INFORMATION7777 777 <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as Facility Name or DBA) 3 <br /> CRLLC#5448 <br /> BUSINESS SITE ADDRESS 103. CITY 104. <br /> 3202 W. Hammer Ln. Stockton <br /> II ;EQIT"YIENT TESTING ANll PItEI' E MINfiENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the_equipment manufacturers'instructions,or annually,whichever is more frequent.Such work must be performed b ualified ersonnel.[z3 CCR§z63z,2634,2638,z641] <br /> P ....._.-. Y..q.-...-._....._p_ _ _._.. - -- --- <br /> MONITORING EQUIPMENT IS SERVICED ❑■ 1.ANNUALLY C1eci 99.OTHER S 490-3a. <br /> (Specify)�')� 490-36. <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632 2634] 490-4. <br /> IY� TAI�i� CNITdTN I ' I2F'QVIED ITSIfiFG TE>FUT,ONG} ETTD( ) t i <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490.5. <br /> WITH AUDIBLE AND VISUAL ALARMS.123 CCR§2632,26341 <br /> SECONDARY CONTAINMENT IS: 0 a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: Veeder Root 490-7. MODEL#: TLS-350 w/ISD 490-8. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-9. MODEL#(S): 407/409 490-10. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 CCR§2643] 490-11. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> 490-18. <br /> PROGRAMMED TESTS: ❑ a.0.l g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): _090-19,_ - <br /> ---- _..--._..-..-----._._......... ...............- ----...- - -._._.._...._..__..__._.._._.._............. _.._._..__.........._.._.-............_ <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.1] 490-20. <br /> ............. _ _._..._ .._._.._..__ _. _......__.........._ ..._-.. .................. __...... <br /> ...❑ ............ ......._...... ._.-...-_ ........_..._........... ..490. ._..4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§2645] TESTING PERIOD: ❑ a.36 HOURS Elb.60 HOURS <br /> _._ _ ._._.__........ . _._ 0-9490- <br /> 21 <br /> ...._..... ... .. _..............__.. ... __._._... ---._.._..-._......--- ---......_.._.__..__.._....__....-.._....._....._........._.._._.._..__... ._.._._.._..__......................._..-...__....._.._..-.._..-...-......_._._......_...._ -2. <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.1] 490-23. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY 490-24. <br /> ---.._... Q_.._.................._.. - ❑ c.OTHER(Specify): 490-25. <br /> ❑ <br /> 99.OTHER(Specify): _._._490-26' <br /> 490-27. <br /> PI 'P QNITQRING=IS PERFO; <br /> ,,' „ VIED LTSTf3r THE FfJ►LLUWING METHUD{ <br /> . „ sh <br /> H 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> [23 36] SECONDARY CONTAINMENT IS: Q a.DRY 490-29. <br /> §2636] ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM <br /> PANEL MANUFACTURER: Veeder Root 490-30. MODEL#: TLS-350 w/ISD 490-31. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-32. MODEL#(S): 208 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. 0 a.YES ❑ b.NO 490-34, <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. N a.YES ❑ b.NO 490-31. <br /> ® 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490.36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§2636] <br /> MLLD MANUFACTURER(S): FE Petro/VMI 490-37. MODEL#(S): STP-MLD and 99LD2000 490-38. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§2636] 490-39. <br /> ELLD MANUFACTURER(S): 490-40. MODEL#(S): 49041. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 49042. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-43, <br /> ELLD FAILUREMISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49044. <br /> -_.... _.-..-.-. _ . ......_._._ . <br /> ❑ 4.PIPE INTEGRITY TESTING. _ ...._.. ...............-_.._ ___. ._. 49045. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS F1 c.OTHER49046. <br /> (Specify) 49047. <br /> ❑ 5.VISUAL PIPE MONITORING. -----_._.___..._....._._.._.._._........._.___.._............_....._......._...-._......_......-....._._____..__..___......__._._._._..._..........._.__._...-__._.._._._.___.._...._.._._._....._.__._ <br /> 49048. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED" 49049. <br /> °Allowed for monirorin of un C!�einggen enerator fuel pj in onl er HSC 25281.5 6 3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(x)(3)] 490-50. <br /> -- - --..-._._ .......--------- ..._..__. . ......... ..._-- ........_. --- ---- _.. .. --..___.. _. .. _........................._._ ..... .......... .........._......................... ................. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51: <br /> ❑ _._._..._ ...._ <br /> .. ......... 49 <br /> . <br /> 0-52. <br /> 99.OTHER(Specify) <br /> 4990-53. <br /> UPCF UST-D(12/2007)-1/4 www.unidocs.org <br />