My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2008-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 4:28:20 PM
Creation date
6/3/2020 9:45:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2011
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_2008-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K. Float and Chain Equipment: ❑ Check this box if floats and chains are not resent at this site. <br /> p <br /> ® Check this box if float and chain equipment is installed but only as <br /> secondary leak detection. <br /> This section must be completed if floats and chains are used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ®Yes ❑ No* Were all float and chain equipment properly inspected and tested for correct functionality? <br /> ®Yes ❑ No* Were all float and chain equipment certified to be working properly? <br /> * In the Section M,below,describe how and when these deficiencies were or will be corrected. <br /> L. Impact Valves: ❑ Check this box if impact valves are not installed. <br /> Complete the following checklist: <br /> ® Yes ❑ No* Were all impact valves properly inspected and tested for correct functionality? <br /> ® Yes ❑ No* Were all impact valves certified to be working properly? <br /> * In the Section M,below,describe how and when these deficiencies were or will be corrected. <br /> M. Comments: <br /> UDC#1-2 91 PRODUCT FLOAT, UDC#7-8 DIESEL AND 87 PRODUCT FLOATS NEED TO HAVE FLOAT <br /> CUP/BOWL CLEANED OUT. TRASH INSIDE THAT CAUSED FLOATS TO STICK AND NOT TRIP SHEAR VALVE. <br /> AFTER CLEANED--RETESTED AND ALL FUNCTIONED PER MANUFACTURES GUIDE LINES. <br /> Page 5 of 5 <br /> Monitoring System Certification <br />
The URL can be used to link to this page
Your browser does not support the video tag.