My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2008-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 4:28:20 PM
Creation date
6/3/2020 9:45:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2011
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_2008-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PF — <br /> ul <br /> �o.• co SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> X <br /> 600 East Main Street, Stockton, CA 95202-3029 <br /> �ql <br /> Telephone:(209)468-3420 Fax: (209)468-3433 Web:www.sjgov.org/ehd <br /> 0 <br /> UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br /> Facility Name: --�g Inspection Date: <br /> Facility Address: / Service Request#: a <br /> Onsite Service Technician's Name: ICC Se ce Technician/Installer Exp.Date: Manufacturer Training: <br /> SERVICE SERVICE <br /> Leak detector /Spill bucket inimum 5 gallon <br /> E] ❑ mechanical Model:❑ electronic Serial#: ❑ 1 hour hydrostatic ❑ Incon TS-STS <br /> aldwell System ❑ Other <br /> ❑ line test programmed <br /> Leak detector <br /> ❑ mechanical ModelSpill bucket ❑ minimum 5 gallon <br /> E] ❑ electronic Serial:: El 1 hour hydrostatic ❑ Incon TS-STS <br /> ❑ line test ro rammed ❑ Caldwell System ❑ Other <br /> sensor Primary piping testing at: <br /> ❑ ❑ positive shutdown Model: ❑ psi <br /> ❑ fail safe Serial#: minutes <br /> ❑ NA <br /> sensor Secondary containment testing for: <br /> ❑ ❑ positive shutdown Model: UDC(s) Piping <br /> ❑ fail safe Serial#: Sump(s) UST(s) <br /> ❑ NA <br /> sensor ❑ Testing for the above components are next due by: <br /> ❑ ❑ positive shutdown Model: <br /> ❑ fail safe Serial#: Note: Please be aware that 21 containment components are required to be tested upon <br /> ❑ NA installation,6 months after,and every 36 months thereafter. <br /> ❑ Drop tube with mechanical overfill at 95% ❑ Cold start of monitoring panel <br /> ❑ Drop tube with mechanical overfill at 95% ❑ Corrosion protection <br /> El Overfill prevention (see LG letter 150-1) ❑ Other: see below <br /> This UST facility is APPROVED to operate ❑ This UST facility is NOT APPROVED to operate <br /> 1A, c— r., <br /> )� `r <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD p tor: By: s Title: <br /> EHD -04 UST SERVICE REQUEST INSPECTION REPORT <br /> Rev 10/06/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.