Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORIW <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI. UNDER DISPENSER CONTAINMENT(UDC) MONITORING <br /> 490-54a <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54b <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING ® 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> –❑ 4_NO DISPENSERS 0 99.OTHER(Specify)_ ___________— ___ _-___ __--------- <br /> _____________'___ ___ 490-56. <br /> PANEL MANUFACTURER:N/A 5590 : MODEL#:N/A <br /> -------------------------------------------------------------------------------- —___—_—– <br /> LEAK SENSOR MANUFACTURER: BRAVO BOX aso-57 i MODEL#(S):82000 49058 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES ®b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ®b.NO 490.60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN.[I a.YES ®b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a.YES ❑b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS 01.SINGLE-WALLED E]2.DOUBLE-WALLED 4903 <br /> IF DOUBLE WALLED: –aeols' <br /> UDC INTERSTITIAL SPACE IS MONITORED BY:.�1.LIQUID E]2.PRESSURE ❑3.VACUUM _ <br /> ----------------- <br /> __A <br /> ------------A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO asoeab <br /> VII. PERIODIC SYSTEM TESTING <br /> ❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION (ELD) MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. (23 CCR <br /> _ 2644.1 <br /> ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> ®2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66 <br /> ----------------------- ---- ---- ----- ----- - ---------------------------------------------------------------------------------------------------------- <br /> ®3.SPILL BUCKETS ARE TESTED ANNUALLY. <br /> 490-67 <br /> VIII. RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> ®Alarm logs 490-68a ❑Visual Inspection Records 490-68b ❑Tank integrity testing results 490-68c <br /> ❑SIR testing results(and supporting documentation records). aso-bed ❑ Tank gauging results(and supporting documentation records). aso-bee <br /> ❑ATG Testing results(and supporting documentation records).490-66f ❑ Corrosion Protection 60-day logs 490-68g <br /> ®Equipment maintenance and calibration records. 4sor>sh <br /> IX.TRAINING <br /> ®Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-690 <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-6se <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490E9f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> ❑ OTHER(Specify):M69h,M69i <br /> ®This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code <br /> Council(ICC). The"Designated UST Operator'will train facility employees in the proper operation and maintenance of the UST systems annually,and <br /> within 30 days of hire.This training will include,but is not limited to,the following: <br /> Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. <br /> 490-71 <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection <br /> equipment covered by this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained <br /> properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME STORE MANAGER 490-72 TITLE MANAGER <br /> DEANNE ROTTA REGIONAL ENVIRONMENTAL COMPLIANCE SPECIALIST <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator,and inform the owner/operator <br /> of any conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE 490-76 DATE: 490-77 <br /> �eraor <br /> 11/1/2011 <br /> REPRE ENTING:❑1.Tank Owner/O orator2.Facili Owner/ 3.Authorized Re resentative of Owner <br /> APPLICANT NAME(print): 49078 APPLICANT TITLE: -790-79 <br /> STEPHEN BOYD REGIONL GAS ENVTL COMPLIANCE MGR <br /> 7-ELEVEN INC#35355, Belshire Environmental Services <br />