My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2008-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 4:28:20 PM
Creation date
6/3/2020 9:45:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2011
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_2008-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 2 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed YES [,f NO [ J <br />2. Manufacturer's spec sheets attached for all equipment to be installedYE41 NO [I <br />3. Description of work to be completed (If adding piping, UDC's, or other UST equipment, or performing tank top upgrade, <br />use he UT Ins Ilation Appliiati n pages 47as necess for timely plan review): <br />Lkkcl L- <br />4. De ri tion of equipment to be used (Attach drawings/blueprints as necessary): <br />-f)LQ1,)ed <br />5. All equipment is State certified or approved. YES\(] NO [ ] <br />6. Decontamination Procedures: �rI j"C <br />a. Will piping be decontaminated prior to removal? YES[] NO[] <br />b. Identify contractor performing decontamination: <br />Name Phone(_) <br />Address City Zip <br />c. Describe method to be used for decontamination: <br />d. Describe how rinsate material will be stored onsite prior to manifesting offsite: <br />e. Rinsate Hauler and permitted Treatment, Storage & Disposal Facility: <br />Hauler Name Phone( Hauler Reg# <br />Address City Zip_— <br />Permitted Disposal Site <br />7, a. Describe the method that will be utilized to purge and/or inert the piping: 91A <br />b. Piping Hauler: <br />Name Phone(_ <br />Address City Zip -- <br />Hauler Registration # (if hauled as hazardous) <br />c. Piping Disposal Site: <br />Phone <br />Name(_) <br />Address City Zip <br />EPA ID# (if transported to a permitted TSD facility) <br />8. Is the sampling firm an independent third party from the contractor? YES [ ] NO [ J l <br />9. Describe, in detail, how the soil and/or water sample(s) beneath the piping or dispenser will be obtained: <br />L� <br />10. Handling of excavated soil (Contaminated Soil Hazardous Waste Hauler): �� <br />Name Hauler Registration # Phone (_) <br />Address City Zip <br />not to be hauled, describe what will be done with it: <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.