Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN (Page 2 of 2) <br />VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING:. <br />1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD <br />490-54a <br />D 1. CONTINUOUS ELECTRONIC MONITORING X2. FLOAT AND CHAIN ASSEMBLY 113. ELECTRONIC STAND-ALONE <br />490.546 <br />04. NO DISPENSERS 99. OTHER (Specify): <br />_❑ _ <br />— PANEL MANUFACTURER: — ----_�—�� -- — – – — — 490-55 r–MODEL #: — -- – — <br />_ <br />490,56. <br />-- 49057 MODEL #(S): — – —�� <br />LEAK SENSOR MANUFACTURER:— <br />490.58 <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a YES ❑ b. NO <br />4W34— <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a- YES ❑ b. NO <br />490.60. <br />FAILURE / DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />490.61 <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. a. YES ❑ b. NO <br />490-62 <br />2. UDC CONSTRUCTION IS SINGLE -WALLED ❑ 2. DOUBLE -WALLED <br />490.63 <br />IF DOUBLE WALLED: <br />a90 -64a <br />UDC INTERSTITIAL SPACE IS MONITORED BY: 1. LIQUID [12. P_R_ESS_URE [13. VACUUM <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a. YES [3b. NO <br />490-"6 <br />77, 777 Vll. PERIODIC SiSTEM TESTING , <br />1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED <br />490-65. <br />LEAK DETECTION (ELD) MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVER_ Y36M_O_NTHS AS REQU RED. (23 CCR §2644.1) <br />_ – — <br />® 2. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. <br />490-66 <br />3. SPILL BUCKETS ARE TESTED ANNUALLY. — — -- — <br />490.67 <br />". VIII: RECQRDKEEPING Y4^; <br />The following monitoring/maintenance records are kept for this facility: <br />® Alarm logs 490fi8a ® Visual Inspection Records 490-696 ❑ Tank integrity testing results 490-68c <br />Q SIR testing results (and supporting documentation records). 490.69d ❑ Tank gauging results (and supporting documentation records). 490.68e <br />❑ ATG Testing results (and supporting documentation records). 490-"f ❑ Corrosion Protection 60 -day logs 490-681; <br />❑ Equipment maintenance and calibration records. 490.68h <br />IX: TRA##$O + <br />® Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490.69a <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />® THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) 49o -69b <br />® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) 490.69c <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e <br />❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION 490.69f <br />❑ SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-69$ <br />❑ OTHER (Specify): M69h, M69i <br />® This facility has a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code Council <br />(ICC). <br />The "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 days of hire. This <br />training will include, but is not limited to, the following: <br />Operation of the UST systems in a manner consistent with the facility's best management practices <br />➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br />The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br />D Names of contact person(s) for emergencies and monitoring alarms. 490.70 <br />X.. +COMMENTS/ADDITIONAL-iNFORMATIOI�F, <br />.._ .,, <br />Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 49o-71 <br />Tank Overfill Prevention: Mechanical flappers set at 95% <br />XI. PERSONNEL RESPONSIBILITIES <br />The UST Owner/Operator is responsible for ensuring that: 1) the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br />this plan occurs, 2) all conditions that indicate a possible release are investigated, and 3) all monitoring records are maintained properly. <br />The following person(s) are responsible for performing the monitoring and equipment maintenance: <br />NAME Store Manager 490,72 TITLE Store Manager <br />490.73 <br />NAME Kent Cain 490-74 TITLE District Manager <br />490-75 <br />The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br />conditions that need follow-up action. <br />`XII. 0 "KWOPERATOR SIGNATURE <br />CERTIFICATION: I certify that the information pr yided herein is true and accurate to the best of my knowledge. <br />APPLICANT SIGNATURE 490.76 <br />DATE: <br />490-77 <br />5/8/08 <br />1 Tank 1er/O r:ratnr O 2. F lit Owner r for 3. Aythqijzgd WrenniativI o[Oweer <br />APPLICANT NAME (print): 490'79 <br />APPLICANT TITLE: <br />490-79 <br />Stephen Boyd <br />HSE Specialist <br />UPCF UST -D (12/2007) 3/4 <br />