My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2008-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 4:28:20 PM
Creation date
6/3/2020 9:45:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2011
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_2008-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A JL Page 1 of 2 <br />Garrett Backus [EH] <br />From: Garrett Backus [EH] <br />Sent: Tuesday, May 06, 2008 2:55 PM <br />To: 'Boyd, Steve (Western States C&E, LLC)' <br />Subject: RE: 3202 Hammer Lane, Stockton, CA <br />Attachments: 20080506080458 001.PDF <br />Hi Steve, <br />Thanks for getting the monitoring plan to me. I need one more thing added to the plan before I can approve it. <br />Section X. Comments/Additional Information must also include the tank overflow prevention method <br />statement. Typically at a site like this with mechanical flappers used for overfill prevention the statement "Tank <br />Overfill Prevention: Mechanical flappers set at 95V is adequate. My apologies for not mentioning this in the prior <br />email. You can also list more than one type of line leak detector in section V. and send us only one <br />monitoring plan for the 87,91 and diesel tanks. <br />On another subject, I approved a permit to install the EVR phase II upgrade. The permit was pulled by RHL <br />Design Group and the construction company is Wilkey's construction. I believe that the work is complete. The <br />permit indicates that the upgrade was done without the ISD part. Even so, I still need to inspect the site to verify <br />that the Veeder Root panel still contains the alarm history. Can you talk with your contractor and tell him to set up <br />an inspection of the site? <br />Thx, <br />Garrett Backus, REHS <br />San Joaquin County Environmental Health Department <br />600 E. Main Street <br />Stockton, CA 95202 <br />telephone: (209) 468-2986 <br />fax: (209) 468-3433 <br />email: gbackus@sjcehd.com <br />From: Boyd, Steve (Western States C&E, LLC) [mailto:Steve.Boyd@contractor.conocophillips.com] <br />Sent: Tuesday, May 06, 2008 8:52 AM <br />To: Garrett Backus [EH] <br />Subject: RE: 3202 Hammer Lane, Stockton, CA <br />Garrett, <br />I'm not sure if I sent this to you yet, but I have attached an updated monitoring plan as you request. If you <br />need anything else, just let me know. <br />Thanks, <br />Stephen oy <br />HSE Specialist <br />Phone: 714-428-6572 <br />5/6/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.