My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2008-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 4:28:20 PM
Creation date
6/3/2020 9:45:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2011
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_2008-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN—PAGE 1 (one form per facili ) <br /> Rol <br /> TYPE OF ACTION ❑ I NEW PLAN ® 2 CIIANGE OF INFORMAIION <br /> I. FACILITY INPUI M_aTIOAT <br /> FACILITY ID# (Agency Use Only) _ t <br /> BUSINESS NAME(Same as FACILITY NAME) <br /> CRLLC #2705448 <br /> $USTNESS SITE ADDRESS —'-' 10] BUSINESS SITE CITY IM <br /> 3202 W. Hammer Lane Stockton, CA 95209 <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP) <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e g,activate pump shut-off,etc)and,if necessary,safely remove I <br /> remaining hazardous material from the UST system { <br /> Y Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater then 30 calendar days,or sooner if required by the local agency Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste <br /> Absorbent material will be used to contain and clean up manageable spills of hazardous materials Absorbent material which has become too saturated to be <br /> effective or which is no Iongel intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§6626211 finds that i <br /> it is non-bazardous Used absorbent material,reusable or waste,will be stored in a property labeled and agaled onta' Waste material shall be disposed of <br /> r <br /> appropriately <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity,has been in contact with any <br /> hazardous material If the water is contaminated,it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §66262 11 finds that it is non-hazardous If the water has a petroleum sheen(i e,rainbow colors),it is contaminated A thick floating petroleum layer may not <br /> necessarily display rainbow colors Water(hazardous or nonhazardous)from sumps,spill containers,etc will not be disposed to storm water systems <br /> We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> I Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2 Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3 Hazardous material,other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment <br /> 7-7 <br /> 'rf'S5i�..�`P�. .t.3.r.+.�a�JL rr��' ��b a}F�,�5 f . �; ti�"t •: . . Y y .4,-.�' . �.r ,..f ;,i_ . ` .- - <br /> This <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permanently onsite is listed in the facility's Hazardous Materials Business Pian <br /> equipment is inspected at least monthly,and a8er each use,supplies are replenished as needed Defective equipment is repaired or replaced as necessary r <br /> I <br /> E UIPMENT NOI'PERMANENTLY ON-SI IE BUT AVAILABLE FOR USE IF NEEDED: (Comp1lete onl licablle) <br /> EQUIPMENT LOCATION — AVAILABILITY <br /> -- ----- R10 ----- — Rao <br /> Ril R21 R31 <br /> ---"—• R12 ----•-----..--'"--- --.��. R22 ----- ..--...- R32 <br /> RI]- R21 R33 <br /> R14 R24 <br /> �_�.-__—'—'- ---- R15 ._ _.. .r_. R23 R35 j } <br /> 1 <br /> ui•• .r '�$ ..aq"';., _., :'fid <::ri.. e.-_- <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN. <br /> NAME — R40 TITLE — Rso <br /> Chuck J.Softich Manager of Compliance&Maintenance <br /> NAME _--------- Mr TITLE Rs 1 I <br /> Dennis Tweedy Maintenance&Compliance Manager — 1 <br /> NAME <br /> R42 Tj'['I,,E �R52 t <br /> NAME Ras TITLE --- - R53 <br /> i <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ❑1 ADDITIONAL SYSTEM TESTING OR DATA COLLECTION X2 INSPECTION BY QUALIFIED PERSONS O 3 RECALIBRATION OF EQUIPMENT Rea <br /> ❑99 OTHER(Specify): Rai <br /> UN-022B-to www.unidocs.org Rev.04/02/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.