My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2008-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 4:28:20 PM
Creation date
6/3/2020 9:45:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2011
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_2008-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order: 2255576 <br />41 SlidEquipment: Cbock this box ifaatk gauging is ar,Od only for ie¢wenhmJ rnntroE. <br />Cheek this box ifno tank gmccc&' g or SIR equipm a is insulted. <br />This :section mast be completed if in -tank gauging equipment is used to perform leak detection monitoring, <br />Core to the folluw ckeekrat `f <br />❑ Yes ❑ No* Has all Input wiring been inspected _& proper entry end termination, including testate for ground faults? <br />© Yes O No* Were a!1 tatrk gauging pfobcv visually inspected for damage and residue buildup? <br />❑ Ycs ❑ No* Was aceuraty of system ptodur:t level readings totted? <br />❑ Yes Q We- Was ucmacy of sysw, water level readings tested? <br />Q Yes ❑ Nos Were all pnubet>einstalled properly? <br />❑ Yes i ❑ No* Were all items on the equipment manuflacturees maimcaaaee drodaistcomplete]? <br />* <br />In the Section H, below, describe how and when these de5ckscies were or will he corrected. <br />G. Line Lear Detectors (LLD). Q Cbeck this box if LLDs sro not instar <br />r`mmnar*fe tint rnEFawiaa ,.r,p,.r;n�. _ . .._ , <br />Yes <br />❑ 130* <br />Fw7 equipmeut stara.np Or moral epripment cottifieruitm, was a leak simulated to verify LLD} perfixmtmce? <br />❑ MA <br />((:heck all thud apply) Simulated leak rate: 43 g.p h4 CIO.] g ph , 00.2",h - <br />0.2 ",h_ <br />CS <br />v=yyy.-- <br />Q No* <br />Were all [.[.DS confirmed operational and aperMe within rept tary requireanents? <br />❑ W <br />Was the tasting apparatus properlyam <br />❑ No* <br />For mxkamiod I,LDs, does the LLD restrict product flow if it demces a leak? <br />E3NIA <br />❑ Yes <br />❑ No* <br />For eleeaooic LI.Ds, lonathe turbine nuromadcally shut otrif the LLD *weia ale&? <br />NIA <br />❑ Yes <br />❑ NO <br />For electronic LLDs, does the turbine automatically slut off if any PerjOQ Of the monkoft system is disabled <br />d NIA <br />or dia� <br />❑ Yes <br />❑ No* <br />For elettrunfc LLM, does the turbine au8omticnHy shut off, if any portion of the monitoring sysivin malfunctions <br />Q9 NIA <br />or fails a test <br />❑ Yes <br />O NO* <br />For electronic LUN, have all accessible wniag retare ;bans bee- visually in9pedW7 <br />je NIA <br />Yes <br />Q No* <br />K'ere all items on ON equipment manufacturer's mainteanace chwklist cdWkc cd? <br />In the Section H, bcbw, describe how and when these deticiencies were or will be corrected. <br />IL Comments' <br />Page 3 of3 NMI <br />Tanknology Inc. 8501 N. MoPac Expressway, Suite 400, Austin, Texas 78759 <br />
The URL can be used to link to this page
Your browser does not support the video tag.