My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2008-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 4:28:20 PM
Creation date
6/3/2020 9:45:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2011
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_2008-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> SAN JOAQUIN COUNTY <br /> y: ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, CA 95202-3029 <br /> Telephone:(209)468-3420 Fax.(209)468-3433 Web:www.sjgov.org/ehd <br /> 9�1FOR� <br /> UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br /> Facility Name: Inspection Date: <br /> --7� -/"C_k— OBJ 2-5, <br /> Facility Address: Service Request#: <br /> Onsite Service Technician's Name: ICC Service Technician/installer Exp.Date: Manufacturer Training: <br /> Bios U1L- k^�- 1 <br /> SERVICE SERVICE <br /> Leak detector Spill bucket ❑ minimum 5 gallon <br /> ❑ mechanical Model: 0 ❑ 1 hour❑ hydrostatic ❑ Incon TS-STS electronic ronic Serial#: <br /> ❑ line test ro rammed ❑ Caldwell System ❑ Other <br /> Leak detector Spill bucket ❑ minimum 5 gallon <br /> ❑ ❑ mechanical Model: ❑ ❑ 1 hour hydrostatic ❑ Incon TS-STS <br /> ❑ electronic Serial#: ❑ Caldwell System ❑ Other <br /> ❑ line test programmed <br /> Leak detector Spill bucket ❑ minimum 5 gallon <br /> ❑ ❑ mechanical Model: ❑ ❑ 1 hour hydrostatic ❑ Incon TS-STS <br /> ❑ electronic Serial#: ❑ Caldwell System ❑ Other <br /> ❑ line test programmed <br /> sensor Primary piping testing at: <br /> ❑ ❑ positive shutdown Model: ❑ psi <br /> ❑ fail safe Serial#: minutes <br /> ❑ NA <br /> sensor Secondary containment testing for: <br /> ❑ ❑ positive shutdown Model: UDC(s) Piping <br /> ❑fail safe Serial#: _ Sump(s) UST(s) <br /> ❑ NA E3sensor Testing for the above components are next due by: <br /> ❑ ❑ positive shutdown Model: <br /> ❑ fail safe Serial#: Note: Please be aware that 2°containment components are required to be tested upon <br /> ❑ NA installation,6 months after,and every 36 months thereafter. <br /> ❑ Drop tube with mechanical overfill at 95% Cold start of monitoring panel <br /> ❑ Drop tube with mechanical overfill at 95% ❑ Corrosion protection <br /> ❑ Overfill prevention (see LG letter 150-1) ❑ Other: see below <br /> In r <br /> A l l <br /> ,r� e> 6v - <br /> THI FACILITY IS SUBJE T TO REINSPECTION A ANY TI AT EHD'S CURRENT HOURLY RATE. <br /> EHD In ReceivedBy: Title: <br /> l. I :41L� <br /> EHD 23-04' UST SERVICE REQUEST INSPECTION REPORT <br /> Rev 11/17//08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.