My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2021 1:25:02 PM
Creation date
6/3/2020 9:45:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_2013-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
509
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E(;EiVEU <br /> F.In-Tank Gauging/SIR Equipment: P Check this box if tank gauging is used only for inventory control. <br /> r Check this box if no tank gauging or SIR equipment is i FRI2015 <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: t f ,rrj nCCi9 <br /> Yes r No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ,, Yes C No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes r No* Was accuracy of system product level readings tested? <br /> Yes r No* Was accuracy of system water level readings tested? <br /> Yes r No* ere all probes reinstalled properly? <br /> Yes No* 1were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): r Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> s Yes = No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance?(Check all that <br /> N/A apply)Simulated leak rater 3 g.p.h.; r 0.1 g.p.h; �',0.2 g.p.h. <br /> C Yes r No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> rt' Yes ;; No* Was the testing apparatus properly calibrated? <br /> Yes r No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> i,r, N/A <br /> Yes r No* or electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> G N/A <br /> - Yes r No* For electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> s N/A onitoring system is disabled or disconnected? <br /> += Yes r No* For electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> r N/A r <br /> onitoring system malfunctions or fails a test? <br /> „ Yes r No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> o N/A <br /> P# Yes r No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.