Laserfiche WebLink
AOL <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK (� <br /> MONITORING PLAN- Page 1 of 2) <br /> TYPE OF ACTION ❑1.NEW PLAN ® 2.CHANGE OF INFORMATION 1 490 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only)❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1 <br /> BUSINESS NAME(Same as FACILITY NAME)7-ELEVEN INC#35355 3. <br /> BUSINESS SITE ADDRESS 3202 W HAMMER LANE 103- CITY STOCKTON 104. <br /> II.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at <br /> the frequency specified by the equipment manufacturers' instructions, or annually, whichever is more frequent, and that such work must be <br /> __performed bygualifledoersonneLS23 CCR X2632,2634,2638,2641Z -------------- <br /> 490-39 <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): 4903b <br /> III. MONITORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑2.SITE PLOT PLANIMAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)490-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 49M <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ® a.DRY E] b.LIQUID FILLED E] c.PRESSURIZED [Id.UNDER VACUUM ° <br /> ---------------------- ---------- -------- <br /> 490-7. 490.9 <br /> PANEL MANUFACTURER: VEEDER ROOT MODEL#: TLS-350R <br /> ----------------------------------- -------- --- - -------------- <br /> LEAK SENSOR MANUFACTURER: VEEDER ROOT 490-s. MODEL#(S): 794390409 490-10 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> 490- 490.13 <br /> PANEL MANUFACTURER: 12. MODEL#: <br /> IN-TANK PROBE MANUFACTURER - 490 10-. - <br /> MODEL#(S): 490-19 <br /> --- --- ----------- - - - --- -- -- -- - - - - <br /> LEAK TEST FREQUENCY: F_] a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> ❑ d.MONTHLY 490-17 <br /> ❑_e_OTHER(Specify)_- ...-- <br /> ------ ---- - - ---- -- -- --- --18 <br /> ------ a90-1a <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: EJ a.36 HOURS El b.60 HOURS 44990-0,22 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> 490-24 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-25 <br /> El99.OTHER (Specify): 490.25 <br /> 490.27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHODS)(Cheek all that apply) <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND VISUAL 490.28 <br /> ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:®a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED [:]d.UNDER VACUUM 490-29 <br /> PANEL MANUFACTURER:VEEDER ROOT 490 MODEL#: TLS-350R 49431 <br /> 30 <br /> LEAK SENSOR MANUFACTURER: VEEDER ROOT 490-32 i MODEL#(S): 794380-208 49033 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ®a.YES ❑b.NO 49034 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490-35 <br /> ® 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR§2636) <br /> --------------------------------- ------------ <br /> MLLD MANUFACTURER(S):FE PETRO(87 8491) 490-37 MODEL#(S):STP-MLD(87 8191) 490-38 <br /> VAPORLESS DSL 99LD2000 DSL <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) <br /> _________490-39 - <br /> -- -- - -- <br /> ELLD MANUFACTURER(S) 440 - MODEL#(S): ------4-9-0-41 <br /> ----------------------------------- -- --- ---------------------- - - --- <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. El2.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑b.NO 490.43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 49044 <br /> ❑ 4.PIPE INTEGRITY TESTING 490.45 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 4904549047 <br /> ❑ 5.VISUAL PIPE MONITORING. 49048 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED' 490-49 <br /> Allowed for monitoring of unburied emer ncy generator fuel piping only per HSC§25281.5(b)(3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA[23 CCR§2636(a)(3)]. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM 490-51 <br /> El 99.OTHER(Specify) 490-53 <br /> 490-53 <br /> 7-ELEVEN INC#35355, Belshire Environmental Services <br />