Laserfiche WebLink
MONITORING ALTERNATIVE #7 Tanks #4 and #5 <br />Limited to underground storage tanks which have infrequent inputs and withdrawals and <br />where the liquic: level in the tank can be measured to an accuracy of +5 gallons or less <br />when the tank is half full. <br />This monitoring alternative shall include: <br />Annual precision test on tank and piping. <br />L//Tank gauging performed as follows: <br />i.ZTank must be capable of being secured to prevent unauthorized inputs and <br />/Tank <br />withdrawals. <br />must have no inputs or withdrawals for at least a 48 hour period <br />(2 days) at the end of consecutive periods lasting up to 7 days. <br />(For example: tank in use Monday through Friday, then locked <br />over weekend). <br />Liquid level measurements are taken at the beginning and end of the <br />monitoring period (lasting at least 48 hours). <br />(For example: level measured and recorded Friday night before <br />locking and again on Monday morning before opening.) <br />__VIf liquid level varies more than 1% of the tank volume or 5 gallons, which <br />ever is less, between measurements, an unauthorized release shall be <br />assumed to have occurred and shall be reported to the local agency within <br />24 hours, as per Article 5, Sect. 2652 of the regulations and further <br />evaluations shall be performed to verify or disprove the variations. <br />Implementation of the monitoring alternative requires that the following circled items be <br />completed by the dates specified. <br />Precision test(s) must be performed by _=�y5,67 <br />nd results submitted to this <br />office within 30 days of the test. <br />( Z./ Tank gauging must be started immediately. (See instructions above). <br />If the above compliance dates cannot be met, contact this office prior to the specified <br />date. <br />4/86 11GT 3 <br />f+oARO of TRUSTEES <br />'SAN JOAQUIN LOCAL -HEALTH DISTRICT' <br />sEAviw® ' <br />James Culbertson, Pres. <br />City of Loan <br />Pallets E. Vannucci, Secy. <br />Anthonette Van Spronsen <br />1601 East Hazelton AVenUeP. 0. Box 20109 <br />, <br />San Joaquin County ` <br />Earl Ptmentei <br />Stockton, California 95201 <br />City f Escaton <br />"' City of Manteca <br />Fern 8u®bee _ <br />k 209/466 6781 <br />oanlai L`: Flores t <br />- <br />_City of Ripon <br />�. z <br />.City of Stockton <br />John 0. Most. M.O. <br />City of Tracy <br />William J, Wad® <br />Jo®1 Khanna; M.O.. M.P.H.; District Health Officer <br />San Joaquin. County -- <br />Mary Anna Love <br />San Joaquin County <br />SHEET #2 <br />Facility Name <br />San Joaquin Co. Public Works - Hazelton Complex <br />Address <br />1810 E. Hazelton. Ave., Stockton <br />Date of Inspection <br />Inspector <br />MONITORING ALTERNATIVE #7 Tanks #4 and #5 <br />Limited to underground storage tanks which have infrequent inputs and withdrawals and <br />where the liquic: level in the tank can be measured to an accuracy of +5 gallons or less <br />when the tank is half full. <br />This monitoring alternative shall include: <br />Annual precision test on tank and piping. <br />L//Tank gauging performed as follows: <br />i.ZTank must be capable of being secured to prevent unauthorized inputs and <br />/Tank <br />withdrawals. <br />must have no inputs or withdrawals for at least a 48 hour period <br />(2 days) at the end of consecutive periods lasting up to 7 days. <br />(For example: tank in use Monday through Friday, then locked <br />over weekend). <br />Liquid level measurements are taken at the beginning and end of the <br />monitoring period (lasting at least 48 hours). <br />(For example: level measured and recorded Friday night before <br />locking and again on Monday morning before opening.) <br />__VIf liquid level varies more than 1% of the tank volume or 5 gallons, which <br />ever is less, between measurements, an unauthorized release shall be <br />assumed to have occurred and shall be reported to the local agency within <br />24 hours, as per Article 5, Sect. 2652 of the regulations and further <br />evaluations shall be performed to verify or disprove the variations. <br />Implementation of the monitoring alternative requires that the following circled items be <br />completed by the dates specified. <br />Precision test(s) must be performed by _=�y5,67 <br />nd results submitted to this <br />office within 30 days of the test. <br />( Z./ Tank gauging must be started immediately. (See instructions above). <br />If the above compliance dates cannot be met, contact this office prior to the specified <br />date. <br />4/86 11GT 3 <br />