My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_1986-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2021 1:00:00 PM
Creation date
6/3/2020 9:45:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1997
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231141_1810 E HAZELTON_1986-1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vitt. SAN JOAQUIN COUNTY <br />COMMUNITY DEVELOPMENT DEPARTMENT <br />1810 E. HAZELTON AVE.. STOCKTON, CA 95205 <br />aA�►`' DEVELOPMENT SERVICES PHONE (209) 468-3120 <br />PLANNING PHONE 1209) 468.3120 <br />BUILDING PHONE (209) 468.3123 <br />NEIGHBORHOOD PRESERVATION PHONE (209) 468.3021 <br />BACKFILL EXCAVATION CERTIFICATE <br />Project Location [�;Nr,_z10t <br />Owner Phone No. <br />qu <br />Contractor ` �s ,,�,av,, ei hone No. ?ra]4j4 Z License No. �oR3 <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />1. <br />Submission <br />of Soil Engineer's Compaction Report within 30 days of project <br />completion, <br />or <br />t/ 2. <br />Submission <br />of verification, e.g. load ticket, within 30 days of project <br />in the excavation in <br />completion <br />that one of the following materials was placed <br />12" lifts: <br />Pea gravel - smooth, rounded material not more than one-half (1/2) <br />inch in diameter. <br />B. <br />Crushed rock - self -compacting material not more than three-quarters <br />rock <br />(3/4) inch in cross sectional measurement. (Use of crushed <br />be for backfill if contact will be made between <br />will not permitted <br />the backfill material and tanks/pipes made of poly resin glass or <br />similar materials.) <br />DECLARATION <br />I hereby <br />certify that <br />a Soil Engineer's Compaction Report will be submitted within 30 days <br />the select material described above <br />of project completion, or submission of verification that <br />per 1000 gallon tank displacement and <br />will be <br />placed at a minimum of five (5) cubic yards <br />will be backfilled and compacted to insure compliance with the <br />that the <br />Uniform <br />entire excavation <br />Building Code <br />Appendix Chapter 70. <br />Name (Print) <br />Zignature <br />le (Prin <br />* Shall be the responsible managing employee on the license or authorized <br />agent. <br />6/91-LC/BECERT.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.