My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 3:02:37 PM
Creation date
6/3/2020 9:45:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231141_1810 E HAZELTON_1998-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In -Tank Gauging / SIR Equipment: <br />❑ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Comalete the following checklist: <br />Yes <br />Q No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Yes <br />Q No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />EX'Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />0'—Yes <br />Yes <br />rL_ <br />❑ No* <br />Was accuracy of system water level readings tested? <br />Y <br />9Y <br />❑ No* <br />Were all probes reinstalled properly? <br />Yes <br />Q No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* to the Section t4 below, describe how and when these deficiencies were or will be corrected. <br />i r 1 <br />Comnlete the following checklist: <br />❑ Check this box if LLDs are not installed. <br />Yes <br />❑ No* <br />❑ N/A <br />For equipment start-up or annual equipment scrtffeation, was a leak simulated to verify LLD performance? <br />(Check all that apply) Simulated leak rate: Ef 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />Y <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />Q No* <br />Was the testing apparatus properly calibrated? <br />0'—Yes <br />Yes <br />rL_ <br />❑ No* <br />❑ N/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />�❑ * <br />!s N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />Yes <br />O jDW <br />ET N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />or disconnected? <br />❑ Yes <br />❑ leo* <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />or fails a test? <br />❑ Yes <br />W <br />O N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />*1n the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />r <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.