Laserfiche WebLink
sov��es <br /> • STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD a` g <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION-FORM B <br /> •C�IIIORN' <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE Nr 8 TANK REMOVED �– <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: i � 1 v L Z L l y� <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS– SPECIFY IF UNKNOWN <br /> A OWNER'S TANK 1.D.# B. MANUFACTURED BY: L N N <br /> C. DATE INSTALLED(MO/DAYNEAR) D. TANK CAPACITY IN GALLONS: <br /> II.TANK CONTENTS IF A-1 IS MARKED,COMPLETE ITEM C. <br /> p 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. to REGULAR UNLEADED ❑ 3 DIESEL ❑ 6 AVIATION GAS <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY lk 1 PRODUCT <br /> ❑ ib PREMIUM UNLEADED ❑ 4 GASAHOL ❑ 7 METHANOL <br /> ❑ Ic MIDGRADE UNLEADED ❑ 5 JET FUEL ❑ 8 M85 <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER(DESCRIBE IN ITEM D.BELOM <br /> D. IF(A1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.III: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B,AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM rzzul 2 SINGLE WALL ❑ 4 SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ i RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> LINING OR ❑ 5 GLASS LINING C�g 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLE WITH 100°/6 METHANOL? YES_ NO— <br /> D.EXTERIOR ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING R,3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL etc. SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> DROP TUBE YES NO STRIKER PLATE YES_ NO DISPENSER CONTAINMENT YES NO <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND AU 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ EAK 1 MECHAMCAL LINE L2 LK TIGHTNESS ❑3 CONTINUOUS INTERSTITIAL 4 ELECTRONIC UNE 5 AUTOMATIC PUMP <br /> DETECTOR ❑ TESTMG MOMTO NG ❑ LEAK DETECTOR ❑ &4UTDOYM ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK 2 RECONCILIATION ONCLLIATIONUAL ORY ❑ 3 MONOITORING ❑ 4 GAUGING AUTOMATIC TANK ❑5 GROUND MONITORINGTER 6 TE�NGTANK <br /> ❑ 7 <br /> MONITORING NUOUS INTERSTITIAL ❑ 8 SIR ❑ 9 WEEKLY' <br /> GAUGING ❑10 MES NGY TANK ❑ 95 UNKNOWN ❑99 OTHER <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PLACE) <br /> 1.ESTIMATED DATESED MO AY/YR) F2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> I LAST SUBSTANCE REMAINING GALLONS INERT MATERIAL 7 YES ❑ NO <br /> THIS FORM AAS&EN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT <br /> TANK OWNER'S NAME DATE <br /> (PRINTED 8 SIGNATURE) p / <br /> v <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR UMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# 00-1 <br /> STATE I.D.1id] Ill I�Jll <br /> t 4 J-Q <br /> PERMIT NUMBER PERMIT APPROVED SY/DATE PERMI PIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS.THIS FORM <br /> SHOULD BE ACCOMPANIED BY A PLOT PFILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THEWROUND STORAGE TANK REGULATIONS <br /> FORMS (6.95) <br />