My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 3:02:37 PM
Creation date
6/3/2020 9:45:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231141_1810 E HAZELTON_1998-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AN -NEW UST INSTALLATION INSPECTION RECORD <br />FACILITY NAME:t ,, -^� C ADDRESS: r� � E . <br />FACILITY ID# TANK# UL# 0 TANK MODEL/MATERIAL: <br />CAPACITY: 102 0 © G PRODUCT: R.E.H.S: ' <br />INITIAL INSPECTIONS <br />!� <br />` <br />A <br />I <br />VACUUM: SOAP: PSI: HRS/MIN: BRINE(LIQUID ANNULAR): � OTHER: <br />'�- <br />P <br />P <br />N <br />I <br />ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br />SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIN: OTHER: <br />(CCR <br />2636 <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS <br />2632 <br />O <br />A <br />J <br />l �✓'(l �f l /,%L1 [ L C/IM CIG <br />2635 <br />E <br />L <br />2632 <br />UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED <br />PEI <br />15. <br />PERFORMANCE TEST OF LINE LEAK DETECTION <br />D <br />S <br />{� <br />ITEM OR EQUIPMENT I UPN ECTED� <br />DATE <br />(b) (1) (C)) <br />PERFORMANCE TEST OF AUTOMATIC PUMP SjgE NUT- F <br />11. ALL PIPING AND FITTINGS CORROSION PROTECTED <br />(CCR <br />2636 <br />1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287) <br />17. <br />12. PIPING SLOPES TO COLLECTION SUMP <br />2. UST INSTALLATION PLANS APPROVED <br />INITIAL INSPECTIONS <br />!� <br />` <br />INSPECTION AND TEST OF SECONDARY CONTAINMENT:I HOIAY: fj <br />c IL cd <br />PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) <br />VACUUM: SOAP: PSI: HRS/MIN: BRINE(LIQUID ANNULAR): � OTHER: <br />'�- <br />PRIMARY TANK TEST: P re S ,sa t,,c- PSI: -9 HRS/MIN: I" <br />1, <br />TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (API/PEI) <br />PIPING INSPECTIONS <br />COMMENTS:— <br />EH23-006 9/95 <br />IM <br />m <br />PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) <br />(CCR <br />2636 <br />(e)) <br />a• i�i <br />•'�. <br />SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIN: OTHER: <br />(CCR <br />2636 <br />(e)) <br />2632 <br />(c) (2)) <br />LAKE TEST ON ALL SUMPS (24 HR. MINIMUM)- HRS: <br />(CCR <br />2635 <br />(a) (4)) <br />(CCR <br />2632 <br />UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED <br />PEI <br />15. <br />PERFORMANCE TEST OF LINE LEAK DETECTION <br />(CCR <br />0. OVERSPILL PERFORMANCE TEST <br />(CCR <br />2635 <br />(b) (1) (C)) <br />PERFORMANCE TEST OF AUTOMATIC PUMP SjgE NUT- F <br />11. ALL PIPING AND FITTINGS CORROSION PROTECTED <br />(CCR <br />2636 <br />(b)) <br />17. <br />12. PIPING SLOPES TO COLLECTION SUMP <br />(CCR <br />2636 <br />(c)(1)) <br />COMMENTS:— <br />EH23-006 9/95 <br />IM <br />m <br />FINAL INSPECTION <br />•'�. <br />PERFORMANCE TEST FOR "ALL" MONITORING PROBES <br />(CCR <br />2632 <br />(c) (2)) <br />l 1 <br />1 <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br />(CCR <br />2632 <br />(c) (2)) <br />15. <br />PERFORMANCE TEST OF LINE LEAK DETECTION <br />(CCR <br />2643 <br />(c) (1)) <br />' <br />PERFORMANCE TEST OF AUTOMATIC PUMP SjgE NUT- F <br />(CCR <br />2636 <br />(g)) <br />17. <br />BALL FLOAT VALVES INSTALLED <br />OVERFILL PROTECTION INSTALLED/APPROVED <br />(CCR <br />2635 <br />(b) (2)) <br />TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) <br />API <br />TANK INTEGRITY TEST (PASSING HARD COPY) <br />(CCR <br />2635 <br />(a) (5)) <br />21. <br />MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE <br />(CCR <br />2632 <br />(d)) <br />"C" FORM COMPLETED AND SUBMITTED <br />(CCR <br />2635 <br />(d)) <br />23. <br />MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED <br />(CCR <br />2630-2636) <br />24. <br />ALL CONDITIONS MET; FACILITY PERMIT ISSUED <br />(H+S <br />CODE <br />25284) <br />COMMENTS:— <br />EH23-006 9/95 <br />IM <br />m <br />
The URL can be used to link to this page
Your browser does not support the video tag.