My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 3:02:37 PM
Creation date
6/3/2020 9:45:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231141_1810 E HAZELTON_1998-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
souwcf8 <br /> STATE OF CALIFORNIA .��` •� roti <br /> STATE WATER RESOURCES CONTROL BOARD i <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B �'� o <br /> •o�tiroww�►- • D <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ,5 CHANGE OF INFORMATION 7 PERMANENTLY CL <br /> PSE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: of <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS– SPECIFY IF UNKNOWN <br /> A OWNER'S TANK 1.D.# B. MANUFACTURED BY: ` ,� j 4,1 j\ <br /> C. DATE INSTALLED(MO/DAYNEAR) �� (\J D. TANK CAPACITY IN GALLONS: <br /> II.TANK CONTENTS IF A-1 IS MARKED,COMPLETE ITEM C. <br /> A. ❑ 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C ❑ 1a REGULAR UNLEADED ❑ 3 DIESEL ❑ 6 AVIATION GAS <br /> ❑❑ <br /> 2 PETROLEUM E] 80 EMPTY 1 PRODUCT lb PREMIUM UNLEADED E:] 4 GASAHOL ❑ 7 METHANOL❑ ❑ 1c MIDGRADE UNLEADED ❑ 5 JET FUEL ❑ 8 M85 <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER(DESCRIBE IN ITEM D.BELOM <br /> D. IF(Al)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.#: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B,AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM ❑-2 SINGLE WALL ❑ 4 SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK ❑,,.1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> LINING OR ❑ 5 GLASS LINING kl�L UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> COATING 'gi <br /> IS LINING MATERIAL COMPATIBLE WITH 100°.6 METHANOL? YES— NO—'24 <br /> D. n. <br /> D.EXTERIOR ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION ❑ 5 CATHODIC PROTECTION 0.,'9"l <br /> (� <br /> $91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL etc, SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTIONQUIPMENT INSTALLED(YEAR) , <br /> DROP TUBE YES NO STRIKER PLATE YES NO DISPENSER CONTAINMENT YES NO <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION A SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 1001/6 METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑1 MECHANICAL UNE LEAK ❑2 UNE TIGHTNESS ❑3 CONTINUOUS WTERSTMAL ❑4 ELECTRONIC UNE ❑5 AUTOMATIC PUMP <br /> DETECTOR TESTING MONITORING LEAK DETECTOR SHUTDOWN OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 MANUAL INVENTORY ❑ 4 AUTOMATIC TANK GROUND WATER TESTING TANK <br /> RECONCILIATIONMONITORING GAUGING MONITORING <br /> ❑ 7 MON TOR NG INTERSTITIAL ❑ 8 SIR ❑ 9 EEK GAUGNGAL ❑10 MOSTINNTHGLY <br /> TANK Eaq5 UNKNOWN ❑99 OTHER <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PLACE) <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED OUANTITY OF 3.WAS TANK FILLED WITH YES E::] NO❑ <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT <br /> TANK''OWNER'S NAME DATE <br /> (PRINTED&SIGNATURE) a ' )r; ;.r <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.4 m "v 1 <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS.THIS FORM <br /> SHOULD BE ACCOMPANIED BY A PLOT PLA�LE THIS FORM WITH THE LOCAL AGENCY��THE U� 0�STORAGE� REGULATIONS <br /> FORM B (6.95) 3 193 <br /> V <br />
The URL can be used to link to this page
Your browser does not support the video tag.