My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 3:15:12 PM
Creation date
6/3/2020 9:45:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231141_1810 E HAZELTON_2010-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES[I NO[t� <br /> 2. Submit copies of ICC Service.Technician and/or Installer's certificate and all manufacturer <br /> training the"Sit Health Safety <br /> for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how rade, use the UST Installation will be <br /> done.ti(If <br /> din <br /> adpiping, UDC's, or other UST equipment, or performing tank top upg <br /> Appl <br /> pages 4-8 as necessary for a timeplan review): <br /> d �lAl Hyl : GAGE" <br /> I I1 � A4 . <br /> �g <br /> zi <br /> /St, 01`I' .. <br /> ` <br /> Y <br /> k w <br /> S L)m <br /> v <br /> P <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-parry approva "6) <br /> v - ^ <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.