My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 3:15:12 PM
Creation date
6/3/2020 9:45:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231141_1810 E HAZELTON_2010-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUMP INSTALLATION CHECKLIST <br /> Al <br /> CONTAINMENT Inspection Procedure For Fiberglass Tank Sumps <br /> SOLUTIONS <br /> Complete this checklist and keep it with copies of any written authorizations for variations and/or deviations received from CSI. <br /> Site Owner Date of Installation <br /> Site Address <br /> Street City State Zip <br /> Installing Contractor <br /> Company Street City State Zip <br /> Yes NO <br /> 1. Did you follow the instructions described in the installation instructions? <br /> 2. Were all sump components inspected for damage prior to installation? <br /> 3. Did you prepare all joints per these instructions? <br /> 4. Were all joints cured hard a minimum of 24 hours without parts being disturbed or moved? <br /> 5. Will the sumps be exposed to high ground water? <br /> 6. Were the sump tops properly protected from traffic loads? <br /> 7. Was an approved backfill method used around and under the entire sump? <br /> 8. Were o-ring gaskets lubricated, clean,and undamaged? <br /> 9. Were all sumps tested for tightness?(check one below) <br /> ❑ Fill sump with water ❑Vacuum test sump with WTL Lid <br /> Installation was in accordance with most recent CSI Installation Instructions Pub.No. INST 6030. <br /> Owner Representative(Print Name) Date Contractor Representative(Print Name) Date <br /> Owner Representative(Signature) Contractor Representative(Signature) <br /> 5150 Jefferson Chemical Road Conroe, Texas 77301-6834 <br /> Tel: 936-756-7731 Fax: 936-756-7766 <br /> www.containmentsolutions.com <br /> Copyright©2008 Containment Solutions,Inc.•All Rights Reserved•Litho in U.S.A.,December 2008•Pub.No.INST 6030E <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.