My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
8660
>
2300 - Underground Storage Tank Program
>
PR0231161
>
COMPLIANCE INFO_1995-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 3:54:44 PM
Creation date
6/3/2020 9:45:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-1999
RECORD_ID
PR0231161
PE
2361
FACILITY_ID
FA0003726
FACILITY_NAME
fast and easy mart #103
STREET_NUMBER
8660
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
STOCKTON
Zip
95210
APN
079-170-390-000
CURRENT_STATUS
01
SITE_LOCATION
8660 LOWER SACRAMENTO RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231161_8660 LOWER SACRAMENTO_1995-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW UST INSTALLATION INSPECTION RECORD <br />FACILITY NAME: ADDRESS: <br />FACILITY ID# TANK# UL# TANK.MODEL/MATERIAL: <br />'CAPACITY: PRODUCT: R.E.H.S: <br />INITIAL INSPECTIONS <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: SOAP: PSI: HRS/MIN: BRINE(LIQUID ANNULAR): OTHER: <br />4. PRIMARY TANK TEST: PSI: HRS/MIN:. <br />5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (API/PEI) <br />PIPING INSPECTIONS <br />A <br />I <br />6. PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) (CCR 2636 (e)) <br />PERFORMANCE TEST FOR "ALL" MONITORING PROBES <br />P <br />N <br />ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br />(2)) <br />P <br />I <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS <br />14. <br />R <br />T <br />9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED PEI <br />(c) <br />0 <br />I <br />10. OVERSPILL PERFORMANCE TEST (CCR 2635 (b) (1) (C)) <br />V <br />A <br />11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2636 (b)) <br />2643 <br />E <br />L <br />12. PIPING SLOPES TO COLLECTION SUMP (CCR 2636 (c)(1)) <br />D <br />S <br />PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF <br />(CCR <br />2636 <br />(g)) <br />ITEM OR EQUIPMEHT INSPECTED <br />DATE <br />17. <br />BALL FLOAT VALVES INSTALLED <br />1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287) <br />2. UST INSTALLATION PLANS APPROVED <br />INITIAL INSPECTIONS <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: SOAP: PSI: HRS/MIN: BRINE(LIQUID ANNULAR): OTHER: <br />4. PRIMARY TANK TEST: PSI: HRS/MIN:. <br />5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (API/PEI) <br />PIPING INSPECTIONS <br />FINAL INSPECTION <br />6. PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) (CCR 2636 (e)) <br />PERFORMANCE TEST FOR "ALL" MONITORING PROBES <br />(CCR <br />2632 <br />7. SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIN: OTHER: (CCA 2636 (e)) <br />(2)) <br />8. LAKE TEST ON ALL SUMPS (24 HR. MINIMUM)- HRS: (CCR 2635 (a) (4)) <br />14. <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br />(CCR <br />9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED PEI <br />(c) <br />(2)) <br />10. OVERSPILL PERFORMANCE TEST (CCR 2635 (b) (1) (C)) <br />15. <br />PERFORMANCE TEST OF LINE LEAK DETECTION <br />11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2636 (b)) <br />2643 <br />(c) <br />(1)) <br />12. PIPING SLOPES TO COLLECTION SUMP (CCR 2636 (c)(1)) <br />FINAL INSPECTION <br />COMMENTS:— <br />EH23-006 9/95 <br />13. <br />PERFORMANCE TEST FOR "ALL" MONITORING PROBES <br />(CCR <br />2632 <br />(c) <br />(2)) <br />14. <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br />(CCR <br />2632 <br />(c) <br />(2)) <br />15. <br />PERFORMANCE TEST OF LINE LEAK DETECTION <br />(CCR <br />2643 <br />(c) <br />(1)) <br />16. <br />PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF <br />(CCR <br />2636 <br />(g)) <br />17. <br />BALL FLOAT VALVES INSTALLED <br />18. <br />OVERFILL PROTECTION INSTALLED/APPROVED <br />(CCR <br />2635 <br />(b) <br />(2)) <br />19. <br />TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT). <br />API <br />20. <br />TANK INTEGRITY TEST (PASSING HARD COPY) <br />(CCR <br />2635 <br />(a) <br />(5)) <br />21. <br />MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE <br />(CCR <br />2632 <br />(d)) <br />22. <br />"C" FORM COMPLETED AND SUBMITTED <br />(CCR <br />2635 <br />(d)) <br />23. <br />MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED <br />(CCR <br />2630-2636) <br />24. <br />ALL CONDITIONS MET; FACILITY PERMIT ISSUED <br />(H+S <br />CODE <br />25284) <br />COMMENTS:— <br />EH23-006 9/95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.