My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
8660
>
2300 - Underground Storage Tank Program
>
PR0231161
>
COMPLIANCE INFO_1995-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 3:54:44 PM
Creation date
6/3/2020 9:45:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-1999
RECORD_ID
PR0231161
PE
2361
FACILITY_ID
FA0003726
FACILITY_NAME
fast and easy mart #103
STREET_NUMBER
8660
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
STOCKTON
Zip
95210
APN
079-170-390-000
CURRENT_STATUS
01
SITE_LOCATION
8660 LOWER SACRAMENTO RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231161_8660 LOWER SACRAMENTO_1995-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Certification: <br />California Edition: March 1998 <br />TLS -350 / 35OPC / 35OR / 35ORPC Line Leak Detector, Series 8484 <br />(Flexible Pipelines) <br />AUTOMATIC ELECTRONIC LINE LEAK DETECTOR <br />Leak rate of 02 gph with Po=100.0% and PFA=O%. <br />0.17 gph. A leak is declared if the output of the measurement system equals or <br />exceeds this threshold. <br />Applicability: Gasoline, diesel, aviation fuel, and solvents. <br />Spec cation: System tests pressurized fiberglass and steel pipelines. <br />Tests are conducted at operating pressure. <br />System will not function with a mechanical line leak detector installed <br />in the pipeline. <br />Pipeline Capacity: Maximum of 40.8 gallons. <br />Waiting Time: None between delivery and testing. <br />Average of 19 minutes between dispensing and testing (ranged from 4 - 69 minutes during the <br />evaluation). <br />Test Period: Response time is 40 - 60 minutes. <br />Test data are acquired and recorded by a microprocessor. <br />Calculations are automatically performed by the microprocessor. <br />System Features: Permanent installation on pipeline. <br />Automatic testing of pipeline. <br />Preset threshold. <br />Single test to determine if pipeline is leaking. <br />Dispenser shutdown, message display and alarm activation if leak is declared. <br />Calibration: System must be checked annually and calibrated if necessary in accordance with <br />manufacturer's instructions. <br />Veeder-Root Evaluator: Midwest Research Institute <br />125 Powder Forest Dr. Tel: (816) 753-7600 <br />Simsbury, CT 06070-2003 <br />Tel: (203) 651-2700 Date of Evaluation: 1/31/97 <br />300 <br />Appearance on this list is not to be consbtred as an endorsement by any regulatory agency nor is 8 any guarantee of the performance of the method or <br />equipmerrL Equipment should be installed and operated in accordance with all app6cabte laws and regulations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.