My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
8660
>
2300 - Underground Storage Tank Program
>
PR0231161
>
COMPLIANCE INFO_1995-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 3:54:44 PM
Creation date
6/3/2020 9:45:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-1999
RECORD_ID
PR0231161
PE
2361
FACILITY_ID
FA0003726
FACILITY_NAME
fast and easy mart #103
STREET_NUMBER
8660
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
STOCKTON
Zip
95210
APN
079-170-390-000
CURRENT_STATUS
01
SITE_LOCATION
8660 LOWER SACRAMENTO RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231161_8660 LOWER SACRAMENTO_1995-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HARDWARE AND ANCHORING POINTS <br />Anchoring hardware and anchor points must be sized according <br />to Table 7 3 and manufactured to industry standards and <br />dimensions. The installing contractor is responsible for providing <br />:hardware and anchor points of sufficient strength. The particular <br />configuration of hardware will be determined by the owner or the <br />owner's representative. Locate the anchor points as shown in <br />Table 7-2 and Figure 7 2. Refer to dimension �'E". Align all anchor <br />points with the marked (><) location on the tanks, within a <br />tolerance of 1 inch. For specific information on hardware and its <br />use, consult the hardware manufacturer. <br />CAUTION: <br />Use only appropriate sized hardware with the strap eye. <br />Oversized hardware may damage the strap eye and result in <br />personal injury or property damage. See Figure 74 for strap <br />eye dimensions. <br />NOTE: Drop4orged type tumbudds may be used in place of ail or a portion of <br />mre rope. <br />NOTE: All exposed metal on the hosidown straps, tumoucides ardor threaded <br />roc must be coated or galvanized to prevent corrosion (Figure 7 -SA). <br />NOTE: when fastening owre rope. use a minimum of three Camps on eadt ioim <br />Use snacide-Stype or chair -type Camps as aqxow= (Figure 74A). <br />FIGURE 7-4A <br />i <br />WARNING-' -- <br />Do not use air pressure to test tanks that contain flammable or <br />combustible liquids or vapors, and do not perform any post- <br />installation pressure test The fuel/afr mixture may explode and <br />cause death, severe personal injury or property damage. Tanks <br />that will be ballasted with a flammable product should be air <br />tested before ballasting. <br />/P WARNING: <br />If product is used as ballast, exercise special care in handling. <br />Safeguard against sparks, fire or product spills. improper <br />handling of product can cause a fire or explosion, damage.nd <br />result in death, severe personal injury or property <br />INTERMEDIATE DEFLECTION MEASUREMENT <br />After backfill is brought to the top of the tank, make an <br />intermediate measurement of vertical deflection according to the <br />instructions in Section 13. <br />TEST <br />After the tank has been measured and vertical deflection is <br />determined to be within the limits specified by Xerxes, the tank <br />must be pressure tested to ensure that no damage occurred <br />during installation. The procedure in Section 2 ?re -installation <br />Testing should be followed, soaping ail exposed areas of the tank <br />and ail fittings. <br />Because most of the tank exterior is no longer visible, the tank <br />must be tested by checking the gauge for one hour at the test <br />manifold for any drop in pressure. Carefuily relieve the pressure <br />in the tank and remove the Quick Disconnect assembly from dry <br />Double Wall tanks. <br />/P WARNING: <br />Do not use air pressure to test tanks that contain lfl nmm a� or <br />combustible liquids or vapors and do not Perform <br />Post- <br />installation pressure test: The fie!lair mixture may explode and <br />cause death, severe personal injury, or property damage. <br />Tanks that will be ballasted with a flammable product should <br />be air tested before ballasting. <br />�t WARNING: <br />if product is used as ballast, exercises ial care in handling. <br />Safeguard against sparks, fire or product spills improper <br />handling of product can cause a fire or explosion, and may <br />result in death, severe personal injury or property damage. <br />T <br />e tank may be ballasted after the backfill is even with the top of <br />the tank and post- nstal}ation testing, f appiicabie, has been <br />successfully completed. Cniy under wet -hole conditions, as <br />described in Section 6, should ballast be added before the backfill <br />is even with the too of the tank. When tilling the tank, make sure <br />the tank is oroperty vented. The vent :must be large enough to <br />allow the displaced air to escape. <br />
The URL can be used to link to this page
Your browser does not support the video tag.