My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
8660
>
2300 - Underground Storage Tank Program
>
PR0231161
>
COMPLIANCE INFO_1995-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 3:54:44 PM
Creation date
6/3/2020 9:45:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-1999
RECORD_ID
PR0231161
PE
2361
FACILITY_ID
FA0003726
FACILITY_NAME
fast and easy mart #103
STREET_NUMBER
8660
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
STOCKTON
Zip
95210
APN
079-170-390-000
CURRENT_STATUS
01
SITE_LOCATION
8660 LOWER SACRAMENTO RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231161_8660 LOWER SACRAMENTO_1995-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*ACKFILL EXCAVATION CERTIFICATE 10 <br />ProjectLocation WoO 1—ouotr Sesci-amr.ok 0 <br />Owner 01"e <br />Lks"p, Phone No. <br />Phone No. t)cj� License No. <br />Contractor kjt�g (ZV\_s*-____ <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br />2. Submission of verification, e.�., load ticket, within 30 days of project completion that one of the following materials was <br />placed in the excavation in 12 lifts: <br />A. Pea gravel --smooth, rounded material not more than one-half (1/2) inch in diameter <br />B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br />measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br />the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br />verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br />displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br />Appendix Chapter 70. <br />Name not <br />Pty s% Age, <br />e Fr1-4 Tt <br />ignJature <br />* Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.