Laserfiche WebLink
This site Safety and Health Plan addresses the safety and health procedures that will be foUowv-i <br />during field operations for the Waste Oil Tank Removal at the Chevron located at 8660 Lower <br />Sacramento Rd. Stockton, CA. Specifically, the SSHP addresses activities pertaining to the <br />removal only and no remediation activities at this time. <br />Approximatelyl field workers, will be involved in the site work activities which are scheduled tit <br />last approximately -L week. <br />1. Key Personnel <br />=91= <br />7. Documentation <br />•-7 <br />� Mwn• ,- • M1119 <br />1114 WA U 04 <br />Mr. Ken Wendt is the Project Manager (PM), Mr. Don Gilmer is the site Health and Safety <br />Offi,er. <br />meets the requirements of title 29 Code of Federal Regulations Part 1910.120. The project <br />manager and other site workers have met the requirements of this regulation under Part 9 <br />Equivalent Training and will receive site specific training before entry to site. <br />