Laserfiche WebLink
0 <br /> SWRCB,January 2002 Page_____of <br /> Se SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer i Industry Standard 0 Professional Engineer <br /> Ci Other(Spec) <br /> Test Method Used: X Pressure `Vacuum 0 Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used Pressure Gauge Equipment Resolution 0-15 PSI <br /> 1 <br /> it <br /> Piping Run# t Piping Run#2 Piping Run#3 Piping Run# , <br /> Piping M <br /> atenal Fiberglass Fiberglass Fiberglass ;E <br /> Piping Manufacturer: Smith Smith Smith i <br /> Piping Diameter: 13" 3" 3" <br /> Length of Piping Run: 80, 80, _ 80' �- <br /> _.. __...._. _. <br /> i Product Stored: Super Plus Regular <br /> Method and location of Test boot Test boot Test boot Test boot <br /> piping-run isolation: —....._......._._' <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 9:00 9:30 9.00 <br /> --_ —__ <br /> Initial Reading(R[} 5 PSI 5 PSI 5 PSI <br /> . : __...__._............ ..... <br /> Test End Time: 10:00 10:30 10:00 <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI <br /> Test Duration: I Hour 1 Hour I Hour 1 Hour <br /> Change in Reading(Rr-RI): 0 0 0 <br /> Pass/Fail Threshold or <br /> 1 Criteria: 0 drop 0 drop 0 drop 0 drop <br /> 'fest Result: X Pass 0 Fail x Pass U Fail x Pass 0 Fait rl Pass 0 Fail <br /> .'oMmelnts— (include information on repairs made prior to testing, and recominended,follotiv-up.for failed testa) <br /> Had to install new shrader valves on test boots for premium and plus lines before testing. <br />