My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
8660
>
2300 - Underground Storage Tank Program
>
PR0231161
>
COMPLIANCE INFO_2002-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 2:51:09 PM
Creation date
6/3/2020 9:45:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2015
RECORD_ID
PR0231161
PE
2361
FACILITY_ID
FA0003726
FACILITY_NAME
fast and easy mart #103
STREET_NUMBER
8660
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
STOCKTON
Zip
95210
APN
079-170-390-000
CURRENT_STATUS
01
SITE_LOCATION
8660 LOWER SACRAMENTO RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231161_8660 LOWER SACRAMENTO_2002-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> SWRCB,January 2002 Page_____of <br /> Se SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer i Industry Standard 0 Professional Engineer <br /> Ci Other(Spec) <br /> Test Method Used: X Pressure `Vacuum 0 Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used Pressure Gauge Equipment Resolution 0-15 PSI <br /> 1 <br /> it <br /> Piping Run# t Piping Run#2 Piping Run#3 Piping Run# , <br /> Piping M <br /> atenal Fiberglass Fiberglass Fiberglass ;E <br /> Piping Manufacturer: Smith Smith Smith i <br /> Piping Diameter: 13" 3" 3" <br /> Length of Piping Run: 80, 80, _ 80' �- <br /> _.. __...._. _. <br /> i Product Stored: Super Plus Regular <br /> Method and location of Test boot Test boot Test boot Test boot <br /> piping-run isolation: —....._......._._' <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 9:00 9:30 9.00 <br /> --_ —__ <br /> Initial Reading(R[} 5 PSI 5 PSI 5 PSI <br /> . : __...__._............ ..... <br /> Test End Time: 10:00 10:30 10:00 <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI <br /> Test Duration: I Hour 1 Hour I Hour 1 Hour <br /> Change in Reading(Rr-RI): 0 0 0 <br /> Pass/Fail Threshold or <br /> 1 Criteria: 0 drop 0 drop 0 drop 0 drop <br /> 'fest Result: X Pass 0 Fail x Pass U Fail x Pass 0 Fait rl Pass 0 Fail <br /> .'oMmelnts— (include information on repairs made prior to testing, and recominended,follotiv-up.for failed testa) <br /> Had to install new shrader valves on test boots for premium and plus lines before testing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.