Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - age 1 of 2 <br />TYPE OF ACTION ❑ 1. NEW PLAN ❑ 2. CHANGE OF INFORMATION 490-1. <br />PLAN TYPE ❑ 1. MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br />(Check one item only) ❑ 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) <br />BUSINESS NAME (Same as Facility Name or DBA) 3. <br />LOw�Vr oter'*jj"? .,des QI�Q✓fie✓► <br />BUSINESS SITE ADDRESS 103. <br />CITY 104. <br />la%® <br />7 rOG Orf <br />II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) must be performed at the frequency specified <br />by the equipment manufacturers' instructions, or annually, whichever is more frequent_ Such work must be performed b)Lqualified personnel_ 123 CCR §2632, 2634, 2638, 26411 <br />MONITORING EQUIPMENT IS SERVICED 1. ANNUALLY ❑ 99. OTHER (Specify): 490-3b. <br />III. MONITORING LOCATIONS <br />❑ 1. NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN 0 2. SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED 123 CCR §z63z, 26341 4900.. <br />IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHODS (Che ' <br />that a I <br />❑ 1. CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br />WITH AUDIBLE AND VISUAL ALARMS. 123 CCR §2632, 26341 <br />SECONDARY CONTAINMENT IS: X a. DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM 490-6. <br />PANEL MANUFACTURER: 490-7 MODEL #: 490-8. <br />LEAK SENSOR MANUFACTURER: 490-9. MODEL #(S): 490-10' <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S). 123 CCR §26431 490-11. <br />PANEL MANUFACTURER: 490-12. MODEL #: 490-13. <br />IN -TANK PROBE MANUFACTURER: 490-14. MODEL #(S): 490-15. <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY 490-16. <br />❑ d. MONTHLY ❑ e. OTHER (Specify): 490-17. <br />PROGRAMMED TESTS: ❑ a. 0.1 h. ❑ b. 0.2 h. El c. OTHER S ecif 490-18. <br />3. MONTHLY STATISTICAL INVENTORY RECONCILIATION [23 CCR §2646.11 490-20. <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) t23 CCR §26451 TESTING PERIOD: E]a. 36 HOURS ❑ b. 60 HOURS ago-zl. <br />ago-zz. <br />(� 5. TANK INTEGRITY TESTING PER t23 CCR §2643.11 490-23. <br />TEST FRE UENCY: a. ANNUALLY El b. BIENNIALLY El c. OTHERS 490 z0.. <br />Q pecify):.. avo=zzs_._ <br />---- -- - --- ----- -- -- ---- - - ---- -- <br />99. OTHER (Specify): 49x26. <br />❑ ago -z7. <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) '1 <br />ack 111 <br />that <br />1. CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE & VISUAL ALARMS. 490-28, <br />2 36R SECONDARY CONTAINMENT IS: a. DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM 490-29, <br />1§26361I <br />PANEL MANUFACTURER: 490-30 MODEL #: 490-31. <br />LEAK SENSOR MANUFACTURER: ago -32. MODEL #(S):D� , 0.90-33. <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP i.e., TURBINE) SHUTDOWN. l l; -34. <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES b -NO -/�0 3s. <br />--- --- - <br />_------------- ------------------------ - --- <br />2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRIC S.QR SHUTS OFF 490-36. <br />PRODUCT FLOW WHEN A LEAK IS DETECTED. 123 CCR§26361 <br />490-37. 490-38. <br />MLLD MANUFACTURER(S): MODEL #(S) J* - h" r- <br />--- ------ --- - - -r <br />� 490-39, <br />3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS. 123 CCR§26341 `1 1 �4 <br />ELLD MANUFACTURER(S): 490-40. MODEL #(S): ` ` ° "r d i 5;; ri ;?j + 490-41. <br />PROGRAMMED IN LINE LEAK TEST: ❑ a. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. -1. <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. a. YES ❑ b. NO 49043. <br />ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. a. YES ❑ b. NO 490-44. <br />- ---- <br />------------- ..- ........ .............. -...... .---............ ---------------------------------._.._._.. <br />Qf 4. PIPE INTEGRITY TESTING. 49045. <br />TEST FREQUENCY_ a. ANNUALLY_ [Ib. EVERY 3 YEARS ❑ c. (Specify) -494-4907x6. <br />-OTHER <br />❑ 5. VISUAL PIPE MONITORING ago as. <br />FREQUENCY: ❑ a. DAILY ❑ b. WEEKLY ❑ C. MIN. MONTHLY & EACH TIME SYSTEM OPERATED" 49049. <br />Allowed for monitoring of unburied emergency generator fuel piping only HSC §2g1ij., @)0 <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA. l23 CCR §2636(a)(3)1 490-50. <br />❑ 7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br />-------------------- ------------- ------------------ <br />❑ 99. OTHER (Specify) 490-53.90-52. <br />UPCF UST -D (12/2007) -1/4 www.unkloes.org <br />