Laserfiche WebLink
F. Ise -Tank Gauging / SIR Lqul ent: Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging. equipment is used to perform leak detection monitoring. <br />Coninlete the following cheeklict- <br />WCre Or will De corrected. <br />G. Lime Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />C m late the foliowin checklist: <br />Yes <br />❑ No* <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ N/A <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />VL3JY❑ <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />I❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />WCre Or will De corrected. <br />G. Lime Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />C m late the foliowin checklist: <br />Yes <br />❑ No* <br />For equipment start-up or annual equipment ertification, was a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Simulated leak rate: 1103 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />❑ No* <br />I Was the testing apparatus properly calibrated? <br />❑ Yes <br />❑, No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />N/A <br />Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ N/A <br />Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ N/A <br />or disconnected? <br />Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off, if any portion of the monitoring system malfunctions <br />❑ N/A <br />or fails a test? <br />Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ N/A <br />Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section <br />H <br />bel d 'b <br />ow, escri a now and when these deficiencies were or will be corrected. <br />H. Comments: <br />Page 3 of 3 <br />