My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 4:11:26 AM
Creation date
6/3/2020 9:45:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231176_2701 W MARCH_1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10-09-95 12:50PM FROM MKTG ENGING/CONSTR TO 919166352606 P002/004 <br /> 1 19 <br /> UNOCAL* Pagel <br /> Unde[grounj Storage Tank Monitoring Program <br /> Written Monitoring Promdure <br /> 1. Sift Name: Unocal 5886 <br /> 2. Site Address and phone number; 2701 W,March Lane Stockton, CA 96207 209/473;7337 <br /> 3. Frequency of performing the Monitoring Method: <br /> TankGauge: Automatic tank gauging. RECEIVE[) <br /> a C T 11 1995 <br /> Tan kMon - Continuous interstitial monitoring of the product tanks. ENVIRONMENTAL,HEALTH <br /> LineMon: Continuous mechanical line leak detection.Double Min angled PERMIT/SEpVICES <br /> to sumps wfth liquid level probes. Positive shutdown of turbines. <br /> 4. Method and equipment to be used for performing the monitoring: <br /> Tanks; <br /> Product Size MateriaI Constructioni Yr Installed i-pi-11Overfill Line Type Line Material <br /> 37 15000 FG/STL DW 95 Y Y DW FG <br /> 92 15000 F DW 95 Y Y DW FG <br /> Dsl It= FG/STL I OW 95 Y ly DW FG <br /> FGISTL 2 3"tank clad wM fiberghm <br /> Monitors: <br /> Product Method Mon Make Man Model Une Meth Line Make Line Model PSD AT BT <br /> 97 ATG Veeder Root TLS-350 Mech RedJacket 131-13 <br /> 87 inter Veeder Root TLS-350 Sump Veeder-Root TLS-360 'I Y <br /> 92 ATG Veeder Root TLS-350 Mech RedJacket DLD <br /> 92 Inter Veeder Root TLS-350 Sump Veeder-Root TLS-350 Y <br /> W ATG Veeder Root TLS-350 ech iRedJackut IDLD <br /> Dal Inter Vesder Root TLS-350 sump Veeder Root TLS-350 Y <br /> PSO=Pas"Shutdown <br /> AT,Annual Tank Tg% <br /> ffr a 61-anniW Tank Too <br /> 5. Locations where monitoring will be performed: <br /> Tank-s*Intorstitial space of double wall tanks. <br /> Lines: Mechanical line leak deteclion.Liquid sensor in sump.Positive shutdown of turbines. <br />
The URL can be used to link to this page
Your browser does not support the video tag.