Laserfiche WebLink
p <br /> F. In-Tank Gauging/SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the/Ono inchecklist: <br /> LQ ® Yes Uf No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes o* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes No* Was accuracy of system product level readings tested? <br /> ❑ Yes * Was accuracy of system water level readings tested? <br /> ❑ Yes o* Were all probes reinstalled properly? <br /> ❑ Yes I No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not inseal <br /> Com lete the follo *nz checklist: /✓6 t WSJ S "'e <br /> ❑ Y#--s ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: ❑3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> ❑ Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LI-Ds,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> - , -Forl4ectronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 0 N/A <br /> O Yes 0 No*- For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> 0 N/A or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments. A-1 cli� 'E L,x' s J l?E=_ 4/ r b S/ zz/I-- <br /> C c � �� 6 /�� ��� U ,O:L°C� ✓tom 1.= j%c ick i, <br /> Page 3 of 3 03:'01 <br />