Laserfiche WebLink
�t <br /> .-A <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> TANKS <br /> UNDERGROUND STORAGE TANKS-TANK PAGE 2 <br /> Pae of <br /> VI.PIPING CONSTRUCTION(check all thatapply) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SYSTEM TYPE 1.PRESSURE ❑2.SUCTION ❑3.GRAVITY 458. ❑1.PRESSURE [12.SUCTION ❑3.GRAVITY 459. <br /> CONSTRUCTION/ [11.SINGLE WALL ❑3.LINED TRENCH ❑99.OTHER 460. ❑1.SINGLE WALL [195.UNKNOWN 462. <br /> MANUFACTURER DOUBLE WALL ❑95.UNKNOWN ❑2.DOUBLE WALL ❑99.OTHER <br /> MANUFACTURER 461. MANUFACTURER 463. <br /> ❑1.BARE STEEL ❑6.FRP COMPATIBLE W/100%METHANOL ❑1.BARE STEEL ❑6.FRP COMPATIBLE W/100%METHANOL <br /> ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL <br /> [13.PLASTIC COMPATIBLE WITH CONTENTS ❑95.UNKNOWN [13.PLASTIC COMPATIBLE W/CONTENTS [18.FLEXIBLE(HDPE) ❑99.OTHER <br /> 4.FIBERGLASS [18.FLEXIBLE(HDPE) ❑99.OTHER ❑4.FIBERGLASS ❑9.CATHODIC PROTECTION <br /> ❑5.STEEL W/COATING ❑9.CATHODIC PROTECTION 464. [15.STEEL W/COATING [195.UNKNOWN 465. <br /> VII.PIPING LEAK DETECTION(check all that )(A n of the mmitoringprogramsholibe submitted to the local .) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SINGLE WALL PIPING 466• SINGLE WALL PIPING 467• <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> ❑1. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP [31. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP <br /> SHUT-OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION SHUT OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION <br /> +AUDIBLE AND VISUAL ALARMS. +AUDIBLE AND VISUAL ALARMS. <br /> [12. MONTHLY 0.2 GPH TEST ❑2. MONTHLY 0.2 GPH TEST <br /> ❑3. ANNUAL INTEGRITY TEST(0.1 GPH) ❑3. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑4. DAILY VISUAL CHECK <br /> CONVENTIONAL SUCTION SYSTEMS CONVENTIONAL SUCTION SYSTEMS(Check all that apply) <br /> ❑5. DAILY VISUAL MONITORING OF PUMPING SYSTEM+TRIENNIAL PIPING ❑5. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> INTEGRITY TEST(0.1 GPH) <br /> SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): C]6. TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> [17. SELF MONITORING SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): <br /> GRAVITY FLOW [17. SELF MONITORING <br /> []9. BIENNIAL INTEGRITY TEST(0.1 GPH) GRAVITY FLOW(Check all that apply): <br /> [18. DAILY VISUAL MONITORING <br /> ❑9. BIENNIAL INTEGRITY TEST(0.1 GPH) <br /> SECONDARILY CONTAINED PIPING SECONDARILY CONTAINED PIPING <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL <br /> ALARMS AND(Check one) ALARMS AND(Check one) <br /> �a-AUTO PUMP SHUT OFF WHEN A LEAK OCCURS [:]a.AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> b.AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM ❑b.AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> DISCONNECTION DISCONNECTION <br /> ❑c. NO AUTO PUMP SHUT OFF ❑c. NO AUTO PUMP SHUT OFF <br /> I1. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITH FLOW SHUT ❑11.AUTOMATIC LEAK DETECTOR <br /> OFF OR RESTRICTION <br /> ❑12. ANNUAL INTEGRITY TEST(0.1 GPH) ❑12.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> SUCTION/GRAVITY SYSTEM SUCTION/GRAVITY SYSTEM <br /> ❑13. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS ❑13.CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Check all that apply) EMERGENCY GENERATORS ONLY(Check all that apply) <br /> ❑14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF ❑14.CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF <br /> AUDIBLE AND VISUAL ALARMS AUDIBLE AND VISUAL ALARMS <br /> ❑15. AUTOMATIC LINE LEAK DETECTOR (3.0 GPH TEST) WITHOUT FLOW ❑15.AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST) <br /> SHUT OFF OR RESTRICTION <br /> ❑16. ANNUAL INTEGRITY TEST(0.1 GPH) ❑16.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑17. DAILY VISUAL CHECK ❑17.DAILY VISUAL CHECK <br /> VIII.DISPENSER CONTAINMENT <br /> DISPENSER CONTAINMENT 468. 161. FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE ❑4. DAILY VISUAL CHECK 469. <br /> DATE INSTALLED ❑2. CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS ❑5. TRENCH/LINER MONITORING <br /> ❑3. CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHITE OFF FOR ❑6. NONE <br /> DISPENSER+AUDIBLE AND VISUAL ALARMS <br /> IX.OWNEWOPERATOR SIGNATURE <br /> I cerqfy 31lat the information provided herein is true and accurate to the best of my knowledge. <br /> SIGN T E OF O E DATE: _ 470• <br /> NAME O NER/OPERATOR t): TITLE OF OWNER/OPERATOR: 472' <br /> Permit Number(Agency use only) 473. 1 Permit Approved By(Agency use only) 474. 1 Permit Expiration Date(Agency use only) 475. <br /> UPCF hwfwrc-b(1/99)-3/4 httpJ/www.uRidecs.org Rev.02/16/00 <br />