My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:06:45 PM
Creation date
6/3/2020 9:46:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231176_2701 W MARCH_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B-200OTm BRAvo Box <br /> Optional fiberglass coating <br /> Optional vapor recovery valve bracket <br /> Optional double <br /> Optional Bravo vapor recovery valve poppet shear valve <br /> Optional factory vapor fitting <br /> Optional factory electrical fitting <br /> with electrical seal Optional Flex Boot with glued <br /> FRP pipe&UL epoxy coated <br /> stainless steel clamps. <br /> Third Party Approved and Tested <br /> with Clamp Isolation System" <br /> PRODUCT FEATURES: STANDARD EQUIPMENT. OPTIONAL EQUIPMENT: <br /> • Made to spec for any brand or model of dis- • Patented float trip shutoff amplification BFH-3-30FRP-A or S Secondary flex <br /> penser. mechanism. boot with Ameron or A.O.Smith pipe <br /> • Low-cost conversion fiarrte allows • Product shear valve,single poppet <br /> UL epoxy <br /> economical retrofitting,without removing existing • Product shear valve bracket glued. �Pattie Tested) <br /> Bravo Box or breaking concrete,when dispenser • Product penetration fittings coated stainless steel clampss <br /> is upgraded.(optional) • Powder epoxy coated paint B-1 vapor recovery shear valve <br /> • Standard steel fiame functions as an anchoring • 8.75"deep BRKT Bl vapor recovery valve bracket <br /> platform and v,aterguard FEF-ES-factory electrical fitting <br /> • UL listed powder epoxy coated steel. with electrical seal <br /> • 12-gauge steel. FVF-NIP factory vapor fitting whupple <br /> . Pte, DPA-double poppet shear <br /> valve adder <br /> • FC-fiberglass coating <br /> • Conversion frame <br /> • Field installed vapor and electrical penetration <br /> fittings. <br /> 1z <br /> 8� <br /> Arm connected to fusible link <br /> of shear valve shuts down <br /> valve automatically <br /> O O <br /> Light float causes positive actuation of shear <br /> valve after leak of approximately 5 oz. in <br /> dispenser box <br />
The URL can be used to link to this page
Your browser does not support the video tag.