Laserfiche WebLink
n <br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> MOI. <br /> TYPE OF ACTION [I1.NEW PLAN 2.CHANGE OF INFORMATION <br /> M02. <br /> PLAN TYPE tKMONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check one item only) A THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FAC ITY O TION <br /> FACILITY ID#(Agency Use Only) <br /> M03. <br /> FACILITY NAME L <br /> .. MOs. <br /> FACILITY SITE ADDRESS �� � L-. � M04' CITY --ro .�` 9 <br /> H. EQUIPMENT TESTING AND P VENTIVEINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in M06 <br /> accordance with the equipment manufacturers'instructions,or annual ,whichever is more frequent. Such work must be performed by qualif€,d personnel. <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): M07. <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general yank and piping layouts and the locations where monitoring is performed(l:f%,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information include it with this Plan. <br /> IV. TANK MONITORING <br /> M10. <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINNIENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: a.DRY ❑ b.LIQUID FILLED c.UNDER PRESSURE ❑ d.UNDER VACUUM Mu. <br /> PANEL MANUFACTURER: _ '"� M12. MODEL#` L»S ;,� M13. <br /> M15, <br /> LEAK SENSOR MANUFACTURER: �,-+ �e- M14. MODEL#(S) , <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATr,4VCTRM USED TQ MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: M16. MODEL#: MIT <br /> . S <br /> IN-TANK PROBE MANUFACTURER: MlsMODEL#O: M19... <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY M20. <br /> C1 d.MONTHLY ❑ e.OTHER(Specify): M21. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): Mz2. M23. <br /> 3.INVENTORY RECONCILIATION [I a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 Mea. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS F1 b.60 HOURS Mzs. <br /> 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): M26. M27. <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agency approval) <br /> ❑ M2s. <br /> 99.OTHER(Specify): <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M30. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT' <br /> SECONDARY CONTAINMENT IS: a.DRY ❑ b.LIQUID FILLED c.UNDER PRESSURE ❑ d.UNDER VACUUM Mai. <br /> PANEL MANUFACTURER: M32. MODEL#: M33. <br /> LEAK SENSOR MANUFACTURER: Mia. MODEL#(S): , Mas. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? VL,i.YES ❑ b.NO M36. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? YES ❑ b.NO M37. <br /> 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PE FORMS 3.0 g.p.h. LEAK TESTS AND RESTI:ICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED ia,.+ <br /> Lzcj <br /> MLLD MANUFACTURER(s): '� ss. MODEL#(S): M39. <br /> ❑ 3.ELECTRONIC LINE LEAK.DETECTOR LLD)THA ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: Mao. MODEL#: Mal" <br /> PROGRAMMED LINE INTEGRITY TES S: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUA IL 0.1 g.p.h. Mae. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ it.YES ❑ b.NO M43. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ it.YES ❑ b.NO M44. <br /> 4.INTEGRITY TESTING <br /> TEST FREQUENCY: a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) Mas. M46. <br /> ❑ 5.VISUAL MONITORING DONE: a.DAILY ❑ b.WEEKLY* ❑ c.MIN.MONTHLY&EACH TIME SYS'T'EM OPERATED** Mai. <br /> *Requires agency approval **Allowed for monitoring of unburied emergency generator fuel piping only per HSC§25281:5(b)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a;)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> [j99.OTHER(Specify) Mas. <br /> SJCEHD-d(07/03)-1/4 07/23/03 <br />