My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:06:45 PM
Creation date
6/3/2020 9:46:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231176_2701 W MARCH_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APR-17-2009 15:23 Service Station Systems 408 938 8888 P.04 <br /> NI 'coring System Certification-P*of 3 <br /> Site Address: 2709 March Ln.@ I-5 Date of Testing/Servicing: 3178109 <br /> F. In-Tank Gauging/SIR Equipment: Ix Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com lets the following checklist: <br /> E3 Yes O No* Has all input wiring,been inspected for proper entry and termination,including testing for ground faults? <br /> 13 Yes 0 No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> 0 Yes 0 No* Was accuracy of system product level readings tested? <br /> 0 Yes 0 No* Was accuracy of system water level readings tested? <br /> 0 Yes 0 No* Were all probes reinstalled properly? <br /> 0 Yes 1 ❑ No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): 13 Check this box if LLD's are not installed. <br /> Com lets the following checklist: <br /> M Yes n No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br /> 0 N/A (Check all that apply) Simulated leak reate:M 3 g.p.h.(I.); ❑ 0.1 g.p.h.(2)" 13 0.2 g.p.h.(2.). <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency,certification Maired only for electronic LLD start-u . <br /> ❑ Yes M No* Were all LLD's confirmed operational and accurate within re ulatory requirements? <br /> m Yes 0 No* Was the testing apparatus properly calibrated? <br /> 0 Yes M No* For mechanical LLD's,does the LLD restrict product flow if it detects a leak? <br /> O N/A <br /> 0 Yes ® No* For electronic LLD's,does the turbine automatically shut off if the LLD detects a leak? <br /> C N/A <br /> 0 Yes 0 No* For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> M N/A or disconnected? <br /> E3 Yes 0 No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system <br /> M N/A malfunctions or fails a test? <br /> 13 Yes El No's For electronic LLD's,have all accessible wiring connections been visually inspected? <br /> 19 N/A <br /> 0Yes 11 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> a In Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: All Leak Detectors failed.Replaced Diesel-would go into slow flow,but would not reset without <br /> shutting off turbines.Ordered Red Jacket Leak Detectors for all turbines. <br />
The URL can be used to link to this page
Your browser does not support the video tag.