My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:06:45 PM
Creation date
6/3/2020 9:46:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231176_2701 W MARCH_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORNFPF <br /> t. UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Pap 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDQ MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-348 <br /> a9asae <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS ❑99.OTHER(Specify): <br /> PANEL MANUFACTURER: >f 4 s MODEL#: 490-5e. <br /> LEAK SENSOR MANUFACTURER: 49M1 MODEL#(S): 490-38 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES GO.NO 490.59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES Clkb,NO 490.60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES M&NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER Wa.YES ❑b.NO 49"2 <br /> L UDC CONSTRUCTION IS 0.SINGLE-WALLED ❑2.DOUBLE-WALLED 4 <br /> 90-0 <br /> IF DOUBLE WALLED: 490.64s <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: Q 1.LIQUID Q 2.PRESSURE Q 3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 490-64& <br /> VII.PERIODIC SYSITM TESTING <br /> 1. ELD TESTING:THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ESH&MM 45. <br /> MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS UIRED. 23 CCR 42644.I <br /> ❑2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS: 490.66 <br /> -13 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490b7 <br /> VIII.RECORDI=PING <br /> The following monitoring/Tiftnetiance records are kept for this facility: <br /> Ism logs 49"M Visual Inspection Records 490-ObTank integrity results 49&6Qe <br /> SIR testing results(and supporting documentation records). 490-M Tank gauging results(and supporting documentation records). 490-6Be <br /> ATG Testing results(and supporting records).49mu Corrosion Protection 60-day logs 4" <br /> Equipment maintenance and calibration records. 49"M <br /> IX TR G <br /> ❑Personnel with UST monitoring responsibility are familiar with all of the following documents relevant to their job duties. 4904% <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)4w*% <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQ (Required)490-69c <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49&694 <br /> CALIFORNIA UNDERGROUND STORAGE TANK LAW 49&690 <br /> STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"49Qb91 <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-599 <br /> ❑ OTHER(Specify):bmw s <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exarn administered by the Intemational Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limier to,the following: <br /> • Operation of the UST system in a manner consistent with the facility's best management practices <br /> • The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> • The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> • Names of contact pexsou(s)for emergencies and monitoring alarms.49&7o <br /> X. CONDUMNADDMONALEWORMATION <br /> Provide additional comments here or indicate low many pages with'Uditionai' n o specific monitoring procedures are attached to this plan.49D.71 <br /> !l lfc '.v c.,� -T ®® t 5 ,4r <br /> M.PRIMNNEL RESPONSIBUITLES <br /> The UST OwnerlOperator is responsible for ensuring that:I)the daily/routne UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The fdIaTtig person(s)are responsible for performing the monitoring and equipment mmttp erumce: <br /> NAME 49&72 TITLE 4W73 <br /> NAME 490-74 TITLE 49&75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operswr,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII-OWNER/OPERATOR SIGNATURE <br /> CERTM ON:I cestifX that the ation proryided herein is true artd wcmft to the best of Ty knowkpd e. <br /> APPLICANT IGNATURE476 DATE: 490-77 <br /> Rim JMJLQ12290oash�--,2 ch—do <br /> APP CANT NAME(print): 490.711 APPLICANT T E. 49°-79 <br /> UPCF UST-D(I2!2407)317 <br />
The URL can be used to link to this page
Your browser does not support the video tag.