Laserfiche WebLink
e <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VL UMER DISPENSER CONTAINMENT NDC)MONITORING <br /> 0-90-540- <br /> 1. UDC MONITORING IS PERFORMED USING T=FOLLOWING METHOD 490-54b <br /> ❑ I,CONTINUOUS ELECTRONIC MONITORING 1,2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS ❑99.OTHERS 490 5s MODEL#: 490-56. <br /> PANEL MANUFACTURER: 0-90-57 0-90-55 <br /> LEAK SENSOR MANUFACf URER MODEL#(S): <br /> a.YES �b.NO 490.59 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS D 490-M. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN [3a.YES Bib,NO <br /> _ 490,61 <br /> FAILURE!DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES Cb.NO <br /> 12 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT TILE DISPENSER. s YES ❑b.NO 4"-62 <br /> a9od3 <br /> 2.UDC CONSTRUCTION IS SINGLE-WALLED ❑2.DOUBLE-WALLED 49044e <br /> IF DOUBLE WALLED: <br /> UDC INTERSTrflAL SPACE IS MONITORED BY: C1 i.LIQUID 1712.PRESSURE 0 3.VACUUM 490fi4b <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES 0 b.NO <br /> W.PERIODIC SYSTEM TESTING <br /> 1, ELD TESTING:THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHASM 0-90 cs. <br /> MUST BE PERFARMED,PERIODIC ELD <br /> AS REQUIRED. 23 CCR 2644.1 <br /> D EVERY 36 MONTHS <br /> IS PERFOItME <br /> SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. ago 66 <br /> SPILL BUCKETS ARE TESTED ANNUALLY. a9rwr <br /> VIII.RECORDIMPING <br /> e following monitoring! ntettance nocords are kept fort16 thcility <br /> lann logs 49oas. UVisual inspection Records 4"b W Tank integrity testing results 49"k <br /> SIR testing results(and supporting documentation records). 490-find ❑ Tank gauging results(and supporting documentation records). 49o.sse <br /> ATG Testing results(and supporting documentation records).4w6w (3 Corrosion Protection 60-day logs 49o.sas <br /> Equipment maintenance and calibration records. 49"M <br /> IX.TRAINING <br /> ❑Persoaeel with UST monitoring mponsibgkies ate familiar with all of the foUaMng dommmmts televant to their job duties. 49o.s9. <br /> RE RENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)woo <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)49ofi9c <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 4sac9d <br /> CALIFORNIA UNDERGROUND STORAGE TANK LAW 004% <br /> STATE WATER RESOURCES CONTROL BOARD(SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"49o-w <br /> 0 SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"4904ft <br /> ❑ OTHER(Specify):m69h,MrA <br /> This facility has a"Designated UST Operator"who has passed the Califomin UST System Operator Exam administered by the Intonational Code Council(ICC)_ <br /> "Designated UST Opetatru"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> framing will include,but is not limited to,the following: <br /> A Operation of the UST systems in a maturer•consistent with the facility's best managdnent practices <br /> D The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> D Names of contact person(s)for emergencies aid monitoring alarms.490.7o <br /> X. COMMS MADDMONAL INFORMATION <br /> Provide additional comments here or' lcate how many s with information 4m specific taring procedures are attic to this plan.490-71 <br /> oui�F!l N v0- 1' « ��a 14k ib,o 5u�a! d elo <br /> M.PERSONNEL RESPONSIBILITITS <br /> The UST Owner0perator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible rolesse are investigated,and 3)all monitoring records are maintained property. <br /> The fol ng petson(s)are a for twforming the monitoring and equipment <br /> NAME 4m-72 TrrLE )j ep- 490.73 <br /> NAME 490.74 TITLE 490.75 <br /> The Designated Operator sball perform a monthly visual inspection of the facility,provide a report to the owneloperstor,and inform the owrialoperatOr of any <br /> conditions that need follow-up axiom. <br /> XM OMMWOPERATOR SIGNATURE <br /> CER ON:I certi that the' provided herein is true and aomuate to d o best of tn knowled e. <br /> APDL NATURE 4W'7G DATE: 490.77 <br /> _]!: <br /> am <br /> A CANT NAME(print). 4W73 qpPLTM: 490-79 <br /> c9m <br /> UPCF UST D(12/2W7)314 N <br /> IIJJ (LLL rrrr------•••"', <br /> 3 ale <br />