Laserfiche WebLink
RECEIVED <br /> APR 0 '018 <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC)TESTING <br /> Test Method Developed By: ❑UDC Manufacturer 0 Industry Standard ❑Professional Engat m.,ARTINA e NT <br /> ❑Other(Specify) <br /> Test Method Used: Q Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Spec) <br /> "Equipmentsed: Incon Sump Tester Equipment Resolution: +/-0.002 Inches <br /> UDC# 11/12 UDC# UDC# UDC# <br /> er: Bravo <br /> Steel <br /> UDC Depth: 12" <br /> Height from UDC Bottom to Top Located on Bottom <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to Located on Bottom <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Good <br /> testing: <br /> Portion of UDC Tested 2"Above Piping <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both N/A <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> Is system programmed for fail- Q Yes ❑No p NA ❑Yes ❑No Q NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> safe shutdown?* <br /> Was fail-safe verified to be Q Yes ❑No p NA ❑Yes ❑No Q NA Q Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> starting test <br /> Test Start Time: 9:19 AM <br /> Initial Reading(RI): 1.9242 Inches Inches Inches Inches <br /> Test End Time: 9:34 AM <br /> Final Reading(RF): 1.9241 Inches Inches Inches Inches <br /> Test Duration: 15 Minutes <br /> Change in Reading(RF-Ri): 0.0001 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Test Result: p Pass ❑Fail ❑ Pass Q Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? ®Yes ❑No Q NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and ®Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes Q No ❑NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />