My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:14:10 PM
Creation date
6/3/2020 9:46:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231176_2701 W MARCH_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Higher Level of Performance <br />The 88 LD -2000 has a higher level of performance over a broader range of burial depth, line length, and <br />piping system types than any other leak detector. <br />Additional Features <br />• Over 20% increased flow capacity o- ; <br />• Guaranteed for 24 months from date of installation to detect a 3 GPH @ 10 PSI leak <br />• One -Way Poppet flow path <br />• Reverse Ratio Piston / Poppet combination <br />• Smaller Volume - Faster Response piston size <br />• Shortest profile leak detector available for'Right' installations AUG 2015 <br />• All fuels: gasoline, diesel, alcohols, Biodiesel, Aviation; see Fuels under technical specifications. <br />• All pipelines (flexible - fiberglass - steel) up to 400 ml. resiliency g <br />• Exceeds EPA regulations, 3 GPH @ 10 PSI <br />• Detects leaks up to 10' above the leak detector <br />• Installs with 2" six point socket or pipe wrench <br />Increased Flow Capacity <br />The 99 LD -2000 has maximized the flow and flow path in existing, older submersible pump heads. This new design allows <br />over 20% more flow than previous LD -2000 models, maximizing pump performance for earlier pump housings. <br />Longest Guarantee <br />The 99 LD -2000 shares the longest guarantee available in the industry, along with all other Vmi 99 LD -2000 series leak <br />detectors and the 99 LD -3000 series leak detectors. For 24 months from date of installation, the 99 LD -2000 is guaranteed to <br />see a 3 GPH leak @ 10 PSI. <br />Field Adjustable Leak Threshold <br />All Vmi mechanical line leak detectors have been factory assembled and tested to meet the EPA leak detection threshold <br />established during certification testing. Abnormal field conditions such as high line resiliency (high bleed -back), pump <br />pressures over 30 PSI and high head pressures affect line leak detection sensitivity. Additionally, wear affects performance of <br />leak detection over time. To meet these issues, Vmi established through certification testing, the ability of field technicians to <br />adjust Vmi mlld's to compensate for field variables and normal wear. Please read Technical Bulletin 032805 for specific <br />instructions on this feature. <br />One -Way Poppet Flow Path <br />The One -Way Poppet Flow Path isolates pump turbulence from line leak detection at pump start-up. The hardened stainless <br />steel poppet does not dimensionally change because of thermal conditions encountered during station operation (precision <br />metering change is insignificant down to -20° F). <br />Reverse Ratio Piston / Poppet Combination <br />Reverse Ratio means the leak detector has a smaller diameter piston area than the poppet it is attached to. This smaller <br />piston area keeps the leak detector in the fast fill position (3 GPM) to a higher line pressure while compressing vapor pockets <br />and expanding flexible pipes faster. This means less time to full Flow. The leak detector does not have to completely reset (as <br />with competitive leak detectors) for the poppet to be forced into the reset mode at pump start-up. <br />Smaller Volume / Faster Response Piston Size <br />With a reduced piston size, there is one-fourth the fuel volume to replace when in leak search and one-fourth the fuel volume <br />to return to the line when the pump turns off. This combination makes for a more responsive and faster leak detector. Less <br />volume to leave the line for the leak detector to reset and catch leaks. Less volume to fill and provide full Flow for dispensing! <br />Superior Flex -Pipe Performance <br />The reduced surface area of the piston significantly reduces the surface area exposed to hydraulic line shock. This results in <br />enhanced performance with steel and fiberglass pipe, and especially with today's flexible pipe. <br />99 LD -2000\E <br />In the early 1990's, the first commercially successful flexible pipe, Total Containment PP -1500, was introduced to the U. S. <br />petroleum industry. Due to the flexibility of this pipe system, no line leak detection would work. In 1992, the Vmi LD -2000\E <br />was certified for 3 GPH @ 10 PSI on Total Containment PP -1500 pipe. The 99 LD -2000\E is still required for existing PP -1500 <br />pipe. Additionally, today the 99 LD -2000\E is used in sites that have the same line characteristics as the LD -2000\E was <br />originally certified for, even though the pipe is different. The original certification of the LD -2000\E concerned the bleed -back <br />modulus of PP -1500 pipe. Today, lines with high bleed -back (generally above 600 ml.) and high head pressure may require <br />the 99 LD -2000\E to pass a field test for annual certification. Consult with factory before ordering and installing the 99 LD -2000 <br />\E. <br />Electronic Line Leak Detection Upgrade! <br />The 99 LD -2000 may be upgraded in the field to eliminate thermal induced slow -flow, provide submersible shut -down, and <br />alarm notification to site monitoring equipment. Request information on the ISM -4080, an easy upgrade for existing or new <br />installations. The ISM -4080 also stages turbines and controls solenoid valves for loading racks and marine applications. if <br />there is no need for staged turbines, solenoid valve control, alarm notification or submersible shut -down, request information <br />on the ARM -4073 to eliminate false alarms only. <br />Preas Image rot a Larger v1eW <br />
The URL can be used to link to this page
Your browser does not support the video tag.