My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:14:10 PM
Creation date
6/3/2020 9:46:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231176_2701 W MARCH_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />Monitoring System Certification - Page 3 of 3 <br />Site Address: 2701 March Ln. <br />REGE 0 <br />IVED <br />MAY 18 2015 <br />Date of Testing/Servicing: 4123/15 <br />-1MVINUNI ENTAL <br />F. In -"lank Gauging / SIR Equipment: 0 CheTffliTbVjxq%1FATMW,- <br />, is used only for inventory control. <br />13 Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Camnlptp the fhUnwina ehoetri-t- <br />o Yes <br />0 No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />11 Yes <br />0 No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />0 Yes <br />0 No* <br />Was accuracy of system product level readings tested? <br />0 Yes <br />0 No* <br />Was accuracy of system water level readings tested? <br />0 Yes <br />a No* <br />Were all probes reinstalled properly? <br />0 Yes <br />0 No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />.• in o-ection H Delow, aescrine now and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): Check this box if LLD's are not installed. <br />Comnlete the, falinwina rhi-ekli4a- <br />0 Yes <br />0 NTo* <br />For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br />0 N/A <br />(Check all that apply) Simulated leak rate: 0 3 g.p.h, (l.); 0 0.1 g.p.h. (2.); 0 0.2 g.p.h. (1). <br />Notes: 1. Required for equipment start-up certification and annual certification. <br />1 Unless mandated by local Hency, certification required only for electronic LLD start-up. <br />a Yes <br />0 No* <br />Were all LLD's confirmed ocrational and accurate within regulatory requirements? <br />0 Yes <br />13 No* <br />Was the testing apparatus properIL calibrated? <br />0 Yes <br />0 No* <br />For mechanical LLD's, does the LLD restrict product flow if it detects a leak? <br />0 N/A <br />0 Yes <br />0 No* <br />For electronic LLD's, does the turbine automatically shut off if the LLD detects a leak? <br />o N/A <br />0 Yes <br />(I No* <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />0 N/A <br />or disconnected? <br />0 Yes <br />0 No* <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system <br />0 N/A <br />malfunctions or fails a test? <br />0 Yes <br />13 No* <br />For electronic LLD's, have all accessible wiring connections been visually inspected? <br />0 N/A <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />- ----- ----- _ <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: Not required to be tested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.