Laserfiche WebLink
8. a. Describe the method that will be utilized top a and/or hue the s} <br /> loo, o®� . `_ I <br /> lbst lei. o4 a cx s o <br /> b. TankIPIpIng Hauler. <br /> Name WeS4 S`f e T <br /> Address l0 M4 1 0 r CO City t 0 Zip <br /> Phone No <br /> lfaaler Registration P(if hauled as hazardous) <br /> C. Tank/Piping Disposal Site: <br /> Name <br /> Ti <br /> Address f 0 � c City ( Zip l <br /> Phone No.( (P <br /> -77 <br /> BPA if(U transported to a permitted TO facility) lg <br /> 9. is the sampling firm an independent third party from the contractor? YES N0[j <br /> 9a. Describe,In detall,how the so andlor water sam le(s) ene m the tank and pipIng <br /> will ob d: ! <br /> I r'Lf t L <br /> ILS;/l tot-ass eves <br /> j ;5 5 <br /> 10. Describe how the excavation wlll be backfilled with suitable material upon removal <br /> � <br /> 9,LA) 4akkS — i 6SIM e-J Ut51 A q e Y-I STS <br /> I <br /> 11. Handling of excavated soil <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> — [ es r6 ;I <br /> b)What will be the final destination of the excavated stockpile? <br /> c)Contaminated Soll Hazardous Waste Hauler. <br /> Name r ons <br /> Address x- / City lido, Zip_ <br /> Phone No.L.X 4 <br /> EH 23 046(Revised 08113199) Page 5 <br />